Risk-based performance evaluation for concrete bridge deck repair

被引:0
作者
Huang, H. [1 ]
Liu, M. [1 ]
机构
[1] Relcon Infrastruct Management Inc, Denver, CO USA
来源
MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES | 2018年
关键词
RELIABILITY-ANALYSIS; BUILDINGS ACI-318; DESIGN CODE; CALIBRATION;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Repair of concrete decks has a significant impact on the total costs of a bridge repair and rehabilitation project. Therefore, it is important to establish a rational procedure and criteria for evaluating deck performance. This paper compares the evaluation procedures and performance criteria in the 2014 Canadian Highway Bridge Design Code with those in the Manual for Bridge Evaluation published by AASHTO in 2011. The fundamental differences between bridge design and evaluation have been identified, followed by a proposed evaluation procedure, where the risks related to the time-dependent uncertainties associated with concrete deterioration and the epistemic uncertainties in measurement and testing methods, including spatial variations, are considered. The proposed procedure is calibrated using a similar procedure for new structure design. More importantly, this paper emphasizes that new bridge design deals with group characteristics of future structures, while bridge evaluation addresses the status of individual elements in existing structures.
引用
收藏
页码:1161 / 1168
页数:8
相关论文
共 50 条
  • [31] Evaluation of the performance of existing non-laboratory based cardiovascular risk assessment algorithms
    Jacob K Kariuki
    Eileen M Stuart-Shor
    Suzanne G Leveille
    Laura L Hayman
    [J]. BMC Cardiovascular Disorders, 13
  • [32] A Semi Risk-Based Approach for Managing Urban Drainage Systems under Extreme Rainfall
    Salinas-Rodriguez, Carlos
    Gersonius, Berry
    Zevenbergen, Chris
    Serrano, David
    Ashley, Richard
    [J]. WATER, 2018, 10 (04)
  • [33] Correction of prediction model output for structural design and risk-based inspection and maintenance planning
    Hifi, Nabile
    Barltrop, Nigel
    [J]. OCEAN ENGINEERING, 2015, 97 : 114 - 125
  • [34] Evaluation of longitudinal force on a railway bridge based on strain measurements
    V. Srinivas
    K. Ramanjaneyulu
    K. Saravana Kumar
    S. Parivallal
    K. Kesavan
    K. Ravisankar
    N. Lakshmanan
    Nagesh R. Iyer
    [J]. Experimental Techniques, 2013, 37 : 55 - 67
  • [35] Evaluation of Longitudinal Force on a Railway Bridge Based on Strain Measurements
    Srinivas, V.
    Ramanjaneyulu, K.
    Kumar, K. Saravana
    Parivallal, S.
    Kesavan, K.
    Ravisankar, K.
    Lakshmanan, N.
    Iyer, Nagesh R.
    [J]. EXPERIMENTAL TECHNIQUES, 2013, 37 (01) : 55 - 67
  • [36] Risk-based least-cost strategy for managing risk associated with porcelain cutout asset in BC hydro system
    Li, H
    Bhuyan, G
    Tarampi, D
    [J]. 2004 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS, 2004, : 993 - 996
  • [37] Risk-based quality accident ranking approach using failure mechanism and Axiomatic domain mapping
    He, Yihai
    Cui, Jiaming
    Liu, Fengdi
    Zhu, Chunling
    [J]. TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2020, 31 (7-8) : 847 - 868
  • [38] Risk-based derivation of target reliability levels for life extension of wind turbine structural components
    Nielsen, Jannie S.
    Sorensen, John D.
    [J]. WIND ENERGY, 2021, 24 (09) : 939 - 956
  • [39] A Risk-Based Multiobjective Optimization Framework to Enhance the Safety of Horizontal Curves with Limited Sight Distance
    Khalil, Mohamed Gamal
    Hussein, Mohamed
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING PART A-SYSTEMS, 2022, 148 (03)
  • [40] Permittivity analysis of weathered concrete in a bridge based on open-ended probe and impedance measurements
    Fan, Benhui
    Bosc, Frederic
    Liu, Yu
    Le Feuvre, Mathieu
    Fauchard, Cyrille
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2024, 429