MODELLING THE FACTORS OF MINE PRODUCTION PLANNING CONSIDERING THE RISK FREE VALUATION AND NEW CUT-OFF GRADES ALGORITHM

被引:2
作者
Dehkharghani, Afshin Akbari [1 ]
机构
[1] Islamic Azard Univ, Tehran, Iran
来源
GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT | 2018年 / 34卷 / 02期
关键词
NPV maximization; cut-off grade; selling price; price prediction; PIT MINING OPERATIONS; OPTIMIZATION; POLICY;
D O I
10.24425/118646
中图分类号
P57 [矿物学];
学科分类号
070901 ;
摘要
The average grades of copper mines are dropped by extracting high grade copper ores. Based on the conducted studies in the mine field, the uncertainty, of economic calculations and the insufficieney of initial information is observed. This matter has drawn considerations to processing methods which not only extracts low grade copper ores but also decreases adverse environmental impacts. In this research, an optimum cut-off grades modelis developed with the objective function of Net Present Value (NPV) maximization. The costs of the processing methods are also involved in the model. In consequence, an optimization algorithm was presented to calculate and evaluate both the maximum NPV and the optimum cut-off grades. Since the selling price of the final product has always been considered as one of the major risks in the economic calculations and designing of the mines, it was included in the modeling of the price prediction algorithm. The results of the algorithm performance demonstrated that the cost of the lost opportunity and the prediction of the selling price are regarded as two main factors directed into diminishing most of the cut-off grades in the last years of the mines' production.
引用
收藏
页码:81 / 96
页数:16
相关论文
共 21 条
[1]   Optimum cut-off grade policy for open pit mining operations through net present value algorithm considering metal price and cost escalation [J].
Asad, M. W. A. .
ENGINEERING COMPUTATIONS, 2007, 24 (7-8) :723-736
[2]  
Asad MWA, 2011, J S AFR I MIN METALL, V111, P741
[3]   A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams [J].
Asad, Mohammad Waqar Ali ;
Dimitrakopoulos, Roussos .
RESOURCES POLICY, 2013, 38 (04) :591-597
[4]  
Bascetin A, 2007, J S AFR I MIN METALL, V107, P87
[5]   LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity [J].
Boland, Natashia ;
Dumitrescu, Irina ;
Froyland, Gary ;
Gleixner, Ambros M. .
COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (04) :1064-1089
[6]  
Dagdelen K., 2007, P INT S MIN PLANN EQ, P226
[7]  
Dagdelen K., 1993, INT S APPL COMP OP R
[8]  
DOWD PA, 1992, 23RD APPLICATION OF COMPUTERS AND OPERATIONS RESEARCH IN THE MINERAL INDUSTRY, P411
[9]  
Hustrulid W, 1996, OPEN PIT MINE PLANIN, V1
[10]  
Johnson P. V., 2011, DETERMINATION DYNAMI, P391