Optimal Fuzzy Scheduling and Sequencing of Work-Intensive Multiple Projects Under Normal and Unexpected Events

被引:6
作者
Al-Refaie, Abbas [1 ]
Qapaja, Ala [1 ]
Al-Hawadi, Ahmad [1 ]
机构
[1] Univ Jordan, Amman, Jordan
关键词
Fuzzy; Optimization Model; Scheduling; Sequencing; Work-Intensive Projects; COST TRADE-OFF; RESOURCE; MULTIMODE; TIME;
D O I
10.4018/IJITPM.2021070105
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This research proposed optimization models for task scheduling and sequencing in work-intensive multiple projects under normal and unexpected events. The objectives of scheduling model were minimizing the total overtime/under-time costs and maximizing satisfaction values on tasks due dates and processing standard times. Further, the sequencing model aimed to minimize the sum of tasks' start times, maximize resource utilization, and maximize satisfaction on project completion times. Illustrations of the proposed scheduling and sequencing optimization models were provided where the results showed effective scheduling and sequencing of project tasks at minimal costs and achieved the desired satisfaction levels on tasks and projects and significantly enhanced resource efficiency at minimal overtime and under-time costs. Further, optimization models were modified to deal with unexpected events. In conclusion, the proposed models may support project managers in planning project tasks in a cost-effective manner under normal and unexpected events.
引用
收藏
页码:64 / 89
页数:26
相关论文
共 27 条
[1]   Non-linear time-cost trade-off models of activity crashing: Application to construction scheduling and project compression with fast-tracking [J].
Ballesteros-Perez, Pablo ;
Elamrousy, Kamel Mohamed ;
Carmen Gonzalez-Cruz, Ma .
AUTOMATION IN CONSTRUCTION, 2019, 97 :229-240
[2]   Multi-mode resource constrained multi-project scheduling and resource portfolio problem [J].
Besikci, Umut ;
Bilge, Umit ;
Ulusoy, Gunduz .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 240 (01) :22-31
[3]   A heuristic method for RCPSP with fuzzy activity times [J].
Bhaskar, Tarun ;
Pal, Manabendra N. ;
Pal, Asim K. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 208 (01) :57-66
[4]  
Calhoun KM, 2002, OMEGA-INT J MANAGE S, V30, P155, DOI 10.1016/S0305-0483(02)00024-5
[5]   Multi-mode resource constrained project scheduling under resource disruptions [J].
Chakrabortty, Ripon K. ;
Sarker, Ruhul A. ;
Essam, Daryl L. .
COMPUTERS & CHEMICAL ENGINEERING, 2016, 88 :13-29
[6]   Preemption resource-constrained project scheduling problems with fuzzy random duration and resource availabilities [J].
Chen, Lu ;
Zhang, Zhe .
JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2016, 33 (06) :373-382
[7]   A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling [J].
Dasovic, Borna ;
Galic, Mario ;
Klansek, Uros .
SUSTAINABILITY, 2020, 12 (08)
[8]  
Delgoshaei A., 2016, DECISION SCI LETT, V5, P499, DOI DOI 10.5267/J.DSL.2016.5.002
[9]   A survey of variants and extensions of the resource-constrained project scheduling problem [J].
Hartmann, Soenke ;
Briskorn, Dirk .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) :1-14
[10]   Scheduling and staffing multiple projects with a multi-skilled workforce [J].
Heimerl, Christian ;
Kolisch, Rainer .
OR SPECTRUM, 2010, 32 (02) :343-368