Nutrient removal as a function of benzene supply within vertical-flow constructed wetlands

被引:11
作者
Tang, Xianqiang [2 ]
Scholz, Miklas [1 ]
Eke, Paul Emeka [1 ]
Huang, Suiliang [2 ]
机构
[1] Univ Edinburgh, Sch Engn & Elect, Inst Infrastruct & Environm, Edinburgh EH9 3JN, Midlothian, Scotland
[2] Nankai Univ, Coll Environm Sci & Engn, Tianjin 300071, Peoples R China
基金
中国国家自然科学基金;
关键词
vertical-flow constructed wetland; nutrients; benzene; temperature; Phragmites australis; WASTE-WATER TREATMENT; SUBSURFACE-FLOW; HORIZONTAL FLOW; NITROGEN; PERFORMANCE; EFFICIENCY; DENITRIFICATION; PHOSPHORUS; SURFACE; MACROPHYTES;
D O I
10.1080/09593330903530793
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The role of benzene, macrophytes and temperature in terms of nutrient removal within constructed wetlands is unknown. Therefore, a research study over approximately 30 months was conducted to assess the potential of vertical-flow constructed wetlands to treat nutrients and to examine the effect of benzene concentration, presence of Phragmites australis (Cav.) Trin. ex Steud (common reed), and temperature control on nutrient removal. Experimental wetlands removed between 72% and 90% of benzene at an influent concentration of 1000 mg L-1. A statistical analysis indicated that benzene is linked to increased effluent chemical oxygen demand and biochemical oxygen demand concentrations. However, there was no significant relationship between benzene treatment and both nitrogen and phosphorus removal. Phragmites australis played a negligible role in organic matter (chemical oxygen demand, biochemical oxygen demand, nitrogen and phosphorus) removal. Control of temperature favoured biochemical oxygen demand removal. However, no significant difference in chemical oxygen demand, and nitrogen and phosphorus removal was detected. Only the combination of the benzene and temperature variables had a significant impact on biochemical oxygen demand removal. The effluent biochemical oxygen demand concentrations in temperature-controlled benzene treatment wetlands were much lower than those located in the natural environment. However, any other combination between benzene, P. australis and the environmental control variables had no significant effect on biochemical oxygen demand, chemical oxygen demand, or nitrogen and phosphorus removal.
引用
收藏
页码:681 / 691
页数:11
相关论文
共 50 条
  • [21] Simplified hydraulic model of French vertical-flow constructed wetlands
    Arias, Luis
    Bertrand-Krajewski, Jean-Luc
    Molle, Pascal
    WATER SCIENCE AND TECHNOLOGY, 2014, 70 (05) : 909 - 916
  • [22] Comparative evaluations of organic matters and nitrogen removal capacities of integrated vertical-flow constructed wetlands: Domestic and nitrified wastewater treatment
    Chang, Jun J.
    Liang, Kang
    Wu, Su Q.
    Zhang, Sheng H.
    Liang, Wei
    JOURNAL OF ENVIRONMENTAL SCIENCE AND HEALTH PART A-TOXIC/HAZARDOUS SUBSTANCES & ENVIRONMENTAL ENGINEERING, 2015, 50 (07): : 757 - 766
  • [23] Reversing Clogging in Vertical-flow Constructed Wetlands by Backwashing Treatment
    Fei, Ma
    Li, Jiang
    Ting, Zeng
    MATERIALS AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2010, 129-131 : 1064 - 1068
  • [24] Nutrient removal in tropical subsurface flow constructed wetlands under batch and continuous flow conditions
    Zhang, Dong Qing
    Tan, Soon Keat
    Gersberg, Richard M.
    Zhu, Junfei
    Sadreddini, Sara
    Li, Yifei
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2012, 96 (01) : 1 - 6
  • [25] Impact of Water Quality Parameters on the Clogging of Vertical-Flow Constructed Wetlands Treating Urban Wastewater
    Sani, Abdulkadir
    Scholz, Miklas
    Babatunde, Akintunde
    Wang, Yu
    WATER AIR AND SOIL POLLUTION, 2013, 224 (03)
  • [26] Seasonal assessment of experimental vertical-flow constructed wetlands treating domestic wastewater
    Sani, Abdulkadir
    Scholz, Miklas
    Bouillon, Ludivine
    BIORESOURCE TECHNOLOGY, 2013, 147 : 585 - 596
  • [27] Nitrogen removal from nitrate-laden wastewater by integrated vertical-flow constructed wetland systems
    Chang, Jun-jun
    Wu, Su-qing
    Dai, Yan-ran
    Liang, Wei
    Wu, Zhen-bin
    ECOLOGICAL ENGINEERING, 2013, 58 : 192 - 201
  • [28] Effect of intermittent operation on contaminant removal and plant growth in vertical flow constructed wetlands: A microcosm experiment
    Jia, Wenlin
    Zhang, Jian
    Wu, Juan
    Xie, Huijun
    Zhang, Bo
    DESALINATION, 2010, 262 (1-3) : 202 - 208
  • [29] Both species richness and growth forms affect nutrient removal in constructed wetlands: A mesocosm experiment
    Luo, Yumei
    Chen, Quan
    Liu, Fan
    Dai, Can
    FRONTIERS IN ECOLOGY AND EVOLUTION, 2023, 11
  • [30] Phosphorus removal performance and biological dephosphorization process in treating reclaimed water by Integrated Vertical-flow Constructed Wetlands (IVCWs)
    Du, Lu
    Chen, Qianru
    Liu, Panpan
    Zhang, Xia
    Wang, Huihui
    Zhou, Qiaohong
    Xu, Dong
    Wu, Zhenbin
    BIORESOURCE TECHNOLOGY, 2017, 243 : 204 - 211