A BIM-based decision-making framework for optimal seismic retrofit of existing buildings

被引:24
作者
Caterino, Nicola [1 ,2 ]
Nuzzo, Iolanda [2 ]
Ianniello, Antonio [3 ]
Varchetta, Giorgio [1 ]
Cosenza, Edoardo [2 ,4 ]
机构
[1] Univ Naples Parthenope, Ctr Direz Isola C4, Dept Engn, I-80143 Naples, Italy
[2] Natl Res Council Italy, Construct Technol Inst, Polo Tecnol San Giovanni Teduccio NA, Rome, Italy
[3] Future Environm Design srls, Terza Traversa Ugo Malfa 4, I-80021 Naples, Italy
[4] Univ Naples Federico II, Dept Struct Engn & Architecture, Via Claudio 21, Naples, Italy
关键词
Decision making process; Conflicting multi-criteria; Optimal seismic retrofit; Building information modelling;
D O I
10.1016/j.engstruct.2021.112544
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The selection of the most suitable seismic retrofit strategy for an existing building may represent a challenging task, due to the multitude of technical solutions available, as well as to conflicting criteria involved in the decision-making process. Such an assessment encompasses several steps in which considerable data sets need to be gathered, stored, managed and exchanged between different project stakeholders, in order to provide a clear understanding of the as-built conditions along with the specific design options. In this context, Multi-Criteria Decision-Making (MCDM) methods represent a viable decision support system when different alternatives need to be evaluated according to a group of criteria, whereas the Building Information Modelling (BIM) methodology is a consolidated collaboration tool for data management and visualisation for construction projects. In this work, an integrated framework is proposed to increase the level of awareness of the Decision Maker (DM) in taking decisions exploiting the capabilities offered by BIM methodology integrated within a MCDM approach. First, the MCDM-BIM framework is presented and the potential benefits due to BIM in MCDM problems for seismic retrofit are highlighted. Then the idea is applied to a RC-frame building case study, modelled in a BIM environment. Three decision-making scenarios are simulated by considering different DM profiles and retrofit strategies. The alternative interventions are evaluated according to a set of criteria by employing data retrieved from the BIM model. Finally, the optimal solution is assessed for each decision-making scenario.
引用
收藏
页数:18
相关论文
共 37 条
[1]   BIM-Based Damage Estimation of Buildings under Earthquake Loading Condition [J].
Alirezaei, Mehdi ;
Noori, Mehdi ;
Tatari, Omer ;
Mackie, Kevin R. ;
Elgamal, Ahmed .
ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 :1051-1058
[2]  
Anelli A., 2016, WORLD ENC C DIS RISK, P1
[3]  
[Anonymous], 3431 OPCM
[4]   Multi-criteria decision-making for seismic resilience and sustainability assessment of diagrid buildings [J].
Asadi, Esmaeel ;
Salman, Abdullahi M. ;
Li, Yue .
ENGINEERING STRUCTURES, 2019, 191 :229-246
[5]  
Autodesk Inc, 2019, AUT REV PROD PAG
[6]  
Autodesk Inc, 2019, AUT DYN PROD PAG
[7]  
Autodesk Inc, 2019, AUT NAV PROD PAG
[8]   Performance-based prioritisation for seismic retrofitting of reinforced concrete bridge bent [J].
Billah, A. H. M. Muntasir ;
Alam, M. Shahria .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2014, 10 (08) :929-949
[9]   Comparative Analysis of Multi-Criteria Decision-Making Methods for Seismic Structural Retrofitting [J].
Caterino, N. ;
Iervolino, I. ;
Manfredi, G. ;
Cosenza, E. .
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2009, 24 (06) :432-445
[10]   Multi-Criteria Decision Making for seismic retrofitting of RC structures [J].
Caterino, Nicola ;
Iervolino, Iunio ;
Manfredi, Gaetano ;
Cosenza, Edoardo .