共 13 条
- [1] Billinton R., 1996, Reliability Evaluation of Power Systems, V2nd, DOI DOI 10.1007/978-1-4615-7731-7
- [4] Brooke Anthony., 1998, A User's Guide
- [5] Chattopadbyay D, 2002, 2002 IEEE POWER ENGINEERING SOCIETY WINTER MEETING, VOLS 1 AND 2, CONFERENCE PROCEEDINGS, P280, DOI 10.1109/PESW.2002.984999
- [6] Optimal scheduling of spinning reserve - Reply [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (04) : 1492 - 1492
- [7] The IEEE reliability test system - 1996 [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) : 1010 - 1018
- [10] Fuzzy MILP Unit Commitment Incorporating Wind Generators [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (04) : 1738 - 1746