Component procurement strategies in decentralized assembly systems under supply uncertainty

被引:22
作者
Pan, Wenting [1 ,2 ]
So, Kut C. [3 ]
机构
[1] St Marys Coll Calif, Sch Econ, Moraga, CA USA
[2] St Marys Coll Calif, Sch Econ & Business Adm, Moraga, CA USA
[3] Univ Calif Irvine, Paul Merage Sch Business, Irvine, CA USA
关键词
Assembly systems; vendor-managed inventory; decentralized system; supply uncertainty; random yields; game theory; TO-ORDER SYSTEMS; RANDOM DEMAND; RANDOM YIELDS; COORDINATION; RELIABILITY; QUANTITIES; DECISIONS; INVENTORY;
D O I
10.1080/0740817X.2015.1063793
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this article we analyze the interactions among the assembler and two component suppliers in their procurement decisions under a Vendor-Managed Inventory (VMI) contract. Under the VMI contract, the assembler first offers a unit price for each component and will pay component suppliers only for the amounts used to meet the actual demand. The two independent component suppliers then decide on the production quantities of their individual components before the actual demand is realized. We assume that one of the component suppliers has uncertainty in the supply process, in which the actual number of components available for assembly is equal to a random fraction of the production quantity. Under the assembly structure, both component suppliers need to take into account the underlying supply uncertainty in deciding their individual production quantities, as both components are required for the assembly of the final product. We first analyze the special case under deterministic demand and then extend our analysis to the general case under stochastic demand. We derive the optimal component prices offered by the assembler and the corresponding equilibrium production quantities of the component suppliers.
引用
收藏
页码:267 / 282
页数:16
相关论文
共 21 条
[1]   Inventory policies in a decentralized assembly system [J].
Bernstein, F ;
DeCroix, GA .
OPERATIONS RESEARCH, 2006, 54 (02) :324-336
[2]   Incentives and commonality in a decentralized multiproduct assembly system [J].
Bernstein, Fernando ;
DeCroix, Gregory A. ;
Wang, Yulan .
OPERATIONS RESEARCH, 2007, 55 (04) :630-646
[3]   Sourcing Decisions with Stochastic Supplier Reliability and Stochastic Demand [J].
Burke, Gerard J. ;
Carrillo, Janice E. ;
Vakharia, Asoo J. .
PRODUCTION AND OPERATIONS MANAGEMENT, 2009, 18 (04) :475-484
[4]   A newsvendor's procurement problem when suppliers are unreliable [J].
Dada, Maqbool ;
Petruzzi, Nicholas C. ;
Schwarz, Leroy B. .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2007, 9 (01) :9-32
[5]   Component Procurement Strategies in Decentralized Assemble-to-Order Systems with Time-Dependent Pricing [J].
Fang, Xiang ;
So, Kut C. ;
Wang, Yunzeng .
MANAGEMENT SCIENCE, 2008, 54 (12) :1997-2011
[6]   Optimal Supply Diversification Under General Supply Risks [J].
Federgruen, Awi ;
Yang, Nan .
OPERATIONS RESEARCH, 2009, 57 (06) :1451-1468
[7]   LOT-SIZING IN ASSEMBLY SYSTEMS WITH RANDOM COMPONENT YIELDS [J].
GERCHAK, Y ;
WANG, YZ ;
YANO, CA .
IIE TRANSACTIONS, 1994, 26 (02) :19-24
[8]   On coordinating an assembly system under random yield and random demand [J].
Guler, M. Guray ;
Bilgic, Taner .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 196 (01) :342-350
[9]  
Gurnani H, 2000, IIE TRANS, V32, P701, DOI 10.1080/07408170008967428
[10]   Coordination in decentralized assembly systems with uncertain component yields [J].
Gurnani, Haresh ;
Gerchak, Yigal .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 176 (03) :1559-1576