A MIP Model for Rolling Horizon Surgery Scheduling

被引:15
|
作者
Luo, Li [1 ]
Luo, Yong [1 ]
You, Yang [1 ]
Cheng, Yuanjun [1 ]
Shi, Yingkang [1 ]
Gong, Renrong [1 ]
机构
[1] Sichuan Univ, Chengdu 610064, Peoples R China
基金
中国国家自然科学基金;
关键词
MIP; Surgery scheduling; Rolling horizon scheduling; OPERATING-THEATER; FRAMEWORK; CARE;
D O I
10.1007/s10916-016-0490-9
中图分类号
R19 [保健组织与事业(卫生事业管理)];
学科分类号
摘要
Most surgery scheduling is done 1 day in advance. Caused by lack of overall planning, this scheduling scheme often results in unbalanced occupancy time of the operating rooms. So we put forward a rolling horizon mixed integer programming model for the scheduling. Rolling horizon scheduling refers to a scheduling scheme in which cyclic surgical requests are taken into account. Surgical requests are updated daily. The completed surgeries are eliminated, and new surgeries are added to the scheduling list. Considering day-to-day demand for surgery, we develop a non-rolling scheduling model (NRSM) and a rolling horizon scheduling model (RSM). By comparing the two, we find that the quality of surgery scheduling is significantly influenced by the variation in demand from day to day. A rolling horizon scheduling will enable a more flexible planning of the pool of surgeries that have not been scheduled into this main blocks, and hence minimize the idle time of operating rooms. The strategy of the RSM helps balance the occupancy time among operating rooms. Using surgical data from five departments of the West China Hospital (WCH), we generate surgical demands randomly to compare the NRSM and the RSM. The results show the operating rooms' average utilization rate using RSM is significantly higher than when applying NRSM.
引用
收藏
页数:7
相关论文
共 50 条
  • [41] A Rolling Horizon Procedure with Optimal Operation Assignment for Job shop Scheduling Problems
    Zuo Yan
    Xue Anke
    Zhou Xiaohui
    Guo Baofeng
    2013 32ND CHINESE CONTROL CONFERENCE (CCC), 2013, : 2580 - 2584
  • [42] Rolling Horizon Approach for Dynamic Parallel Machine Scheduling Problem with Release Times
    Tang, Lixin
    Jiang, Shujun
    Liu, Jiyin
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2010, 49 (01) : 381 - 389
  • [43] Improved rolling horizon procedure for single-machine scheduling with release times
    Wang, Bing
    Xi, Yu-Geng
    Gu, Han-Yu
    Kongzhi yu Juece/Control and Decision, 2005, 20 (03): : 257 - 260
  • [44] Rolling Horizon Non-Myopic Scheduling of Multifunction Radar for Search and Track
    Byrne, Marion
    White, Krueger
    Williams, Jason
    2016 19TH INTERNATIONAL CONFERENCE ON INFORMATION FUSION (FUSION), 2016, : 634 - 642
  • [45] A Data-Driven Rolling-Horizon Online Scheduling Model for Diesel Production of a Real-World Refinery
    Cao Cuiwen
    Gu Xingsheng
    Xin Zhong
    AICHE JOURNAL, 2013, 59 (04) : 1160 - 1174
  • [46] Intelligent Scheduling Optimization of Seasonal CCHP System Using Rolling Horizon Hybrid Optimization Algorithm and Matrix Model Framework
    Wang Yanan
    Wu Jiekang
    Mao Xiaoming
    IEEE ACCESS, 2018, 6 : 75132 - 75142
  • [47] An accelerated MIP model for the single machine scheduling with preventive maintenance
    Souissi, Omar
    Benmansour, Rachid
    Artiba, Abdelhakim
    IFAC PAPERSONLINE, 2016, 49 (12): : 1945 - 1949
  • [48] New MIP model for multiprocessor scheduling problem with communication delays
    El Cadi, Abdessamad Ait
    Ben Atitallah, Rabie
    Hanafi, Said
    Mladenovic, Nenad
    Artiba, Abdelhakim
    OPTIMIZATION LETTERS, 2017, 11 (06) : 1091 - 1107
  • [49] New MIP model for multiprocessor scheduling problem with communication delays
    Abdessamad Ait El Cadi
    Rabie Ben Atitallah
    Saïd Hanafi
    Nenad Mladenović
    Abdelhakim Artiba
    Optimization Letters, 2017, 11 : 1091 - 1107
  • [50] Rolling Horizon Scheduling Procedure for SWRO Desalination Plant under Uncertain Freshwater Demand
    Wang, Jian
    Lian, Lekai
    Wang, Xiaolong
    Shu Jiangzhou
    Ping Li
    26TH CHINESE CONTROL AND DECISION CONFERENCE (2014 CCDC), 2014, : 2692 - 2695