Total output operation chart optimization of cascade reservoirs and its application

被引:28
作者
Jiang, Zhiqiang [1 ]
Ji, Changming [1 ]
Sun, Ping [1 ]
Wang, Liping [1 ]
Zhang, Yanke [1 ]
机构
[1] North China Elect Power Univ, Sch Renewable Energy, Beijing 102206, Peoples R China
关键词
Cascade reservoirs; Total output operation chart; Operation rules; Discriminant criterion method; Progressive optimality algorithm; Stepwise regression; Li Xianjiang basin; HYDROTHERMAL POWER-SYSTEMS; DIFFERENTIAL EVOLUTION; NEURAL-NETWORK; HYDROPOWER; MODELS; RULES; SIMULATION; WATER;
D O I
10.1016/j.enconman.2014.08.043
中图分类号
O414.1 [热力学];
学科分类号
摘要
With the rapid development of cascade hydropower stations in recent decades, the cascade system composed of multiple reservoirs needs unified operation and management. However, the output distribution problem has not yet been solved reasonably when the total output of cascade system obtained, which makes the full utilization of hydropower resources in cascade reservoirs very difficult. Discriminant criterion method is a traditional and common method to solve the output distribution problem at present, but some shortcomings cannot be ignored in the practical application. In response to the above concern, this paper proposes a new total output operation chart optimization model and a new optimal output distribution model, the two models constitute to a double nested model with the goal of maximizing power generation. This paper takes the cascade reservoirs of Li Xianjiang River in China as an instance to obtain the optimal total output operation chart by the proposed double nested model and the 43 years historical runoff data, progressive searching method and progressive optimality algorithm are used in solving the model. In order to take the obtained total output operation chart into practical operation, mean value method and stepwise regression method are adopted to extract the output distribution ratios on the basis of the optimal simulation intermediate data. By comparing with discriminant criterion method and conventional method, the combined utilization of total output operation chart and output distribution ratios presents better performance in terms of power generation and assurance rate, which proves it is an effective alternative method to deal with the cascade reservoirs joint operation problem. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:296 / 306
页数:11
相关论文
共 30 条
  • [11] A modified hybrid differential evolution for short-term scheduling of hydrothermal power systems with cascaded reservoirs
    Lakshminarasimman, L.
    Subramanian, S.
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2008, 49 (10) : 2513 - 2521
  • [12] [刘心愿 LIU Xinyuan], 2009, [水力发电学报, Journal of Hydroelectric Engineering], V28, P26
  • [13] DROUGHT WATER RATIONING AND TRANSFERABLE RATIONS
    LUND, JR
    REED, RU
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1995, 121 (06): : 429 - 437
  • [14] Derived operating rules for reservoirs in series or in parallel
    Lund, JR
    Guzman, J
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1999, 125 (03): : 143 - 153
  • [15] Luo B, 2010, YANGTZE RIVER, V41, P8
  • [16] Short-term optimal operation of Three-gorge and Gezhouba cascade hydropower stations in non-flood season with operation rules from data mining
    Ma, Chao
    Lian, Jijian
    Wang, Junna
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2013, 65 : 616 - 627
  • [17] Developing monthly operating rules for a cascade system of reservoirs: Application of Bayesian Networks
    Malekmohammadi, Bahram
    Kerachian, Reza
    Zahraie, Banafsheh
    [J]. ENVIRONMENTAL MODELLING & SOFTWARE, 2009, 24 (12) : 1420 - 1432
  • [18] Short-term combined economic emission scheduling of hydrothermal power systems with cascaded reservoirs using differential evolution
    Mandal, K. K.
    Chakraborty, N.
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2009, 50 (01) : 97 - 104
  • [19] Fuzzy rule-based model for hydropower reservoirs operation
    Moeini, R.
    Afshar, A.
    Afshar, M. H.
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2011, 33 (02) : 171 - 178
  • [20] Optimal short-term operation schedule of a hydropower plant in a competitive electricity market
    Perez-Diaz, Juan I.
    Wilhelmi, Jose R.
    Arevalo, Luis A.
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2010, 51 (12) : 2955 - 2966