共 32 条
- [1] Strategies to Automatically Derive a Process Model from a Configurable Process Model Based on Event Data [J]. APPLIED SCIENCES-BASEL, 2017, 7 (10):
- [2] Assy N, 2014, LECT NOTES COMPUT SC, V8831, P1, DOI 10.1007/978-3-662-45391-9_1
- [3] Austin S., 2000, Construction Management and Economics, V18, P173, DOI [DOI 10.1080/014461900370807, 10.1080/014461900370807]
- [4] Handling Concept Drift for Predictions in Business Process Mining [J]. 2020 IEEE 22ND CONFERENCE ON BUSINESS INFORMATICS (CBI 2020), VOL I - RESEARCH PAPERS, 2020, : 76 - 83
- [5] Bose R. P. Jagadeesh Chandra, 2011, Advanced Information Systems Engineering. Proceedings 23rd International Conference, CAiSE 2011, P391, DOI 10.1007/978-3-642-21640-4_30
- [6] Buijs J. C. A. M., 2013, Business Process Management. 11th International Conference, BPM 2013. Proceedings: LNCS 8094, P33, DOI 10.1007/978-3-642-40176-3_5
- [7] Buijs J.C.A.M., 2013, P 2 INT S DAT DRIV P
- [8] Ceravolo P., 2020, IEEE T SERVICES COMP
- [9] Gottschalk F., 2009, Configurable process models
- [10] Gottschalk F., 2007, Reference modeling, P59, DOI [10.1007/978-3-7908-1966-33, DOI 10.1007/978-3-7908-1966-33]