Investigating the Human Errors in 4D BIM Construction Scheduling

被引:0
|
作者
Kandregula, Shravan Kumar [1 ]
Le, Tuyen [1 ]
机构
[1] Clemson Univ, Glenn Dept Civil Engn Construct Engn & Management, Clemson, SC 29634 USA
来源
CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS | 2020年
关键词
Building Information Modeling; BIM; 4D-BIM; 4D-Visualization; 4D-Scheduling; Construction Scheduling; Scheduling; Construction Planning and Scheduling; Human Errors; Human Error Taxonomy (HET); Cognition error theories;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Four-dimensional building information modeling (4D-BIM or 4D scheduling) is well known to benefit the construction industry in many ways. 4D-BIM is an effective scheduling technique which integrates traditional scheduling methods and advanced visualization of the construction sequences in a 3D environment. Despite the potential benefits of 4D-BIM to improve scheduling quality, errors still often occur in construction schedules. The objective of this research is to understand the association between human errors and computer-aided scheduling. This paper focuses on examining the current practices of 4D-scheduling to gain insights on potential errors during the process of scheduling. Furthermore, the paper discusses a set of root causes of scheduling errors based on different types of human errors in cognition error theories. The research determined human errors through an integrated approach of literature review and a survey. The results of this study are expected to provide new knowledge about what human errors that commonly occur during the scheduling processing using BIM and their root causes.
引用
收藏
页码:750 / 757
页数:8
相关论文
共 50 条
  • [31] THE NEED FOR MULTI-LOD 4D SIMULATIONS IN CONSTRUCTION PROJECTS
    Butkovic, Bogdan
    Heesom, David
    Oloke, David
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2019, 24 : 256 - 272
  • [32] Developing a framework to revolutionise the 4D BIM process: IPD-based solution
    Elghaish, Faris
    Abrishami, Sepehr
    CONSTRUCTION INNOVATION-ENGLAND, 2020, 20 (03): : 401 - 420
  • [33] Students' awareness and perception of the value of BIM and 4D for site health and safety management
    Swallow, Mark
    Zulu, Sambo
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2019, 18 (02) : 414 - 430
  • [34] 4D BIM models for smart utility relocation management in urban infrastructure projects
    Vilventhan, Aneetha
    Razin, Sanu
    Rajadurai, R.
    FACILITIES, 2021, 39 (1-2) : 50 - 63
  • [35] The need for multi-LOD 4D simulations in construction projects
    Butkovic B.
    Heesom D.
    Oloke D.
    Journal of Information Technology in Construction, 2019, 24 : 256 - 272
  • [36] 4D dynamic construction management and visualization software: 1. Development
    Chau, KW
    Anson, M
    Zhang, JP
    AUTOMATION IN CONSTRUCTION, 2005, 14 (04) : 512 - 524
  • [37] 4D CAD models to support the coordination of construction activities between contractors
    Trebbe, Martijn
    Hartmann, Timo
    Doree, Andre
    AUTOMATION IN CONSTRUCTION, 2015, 49 : 83 - 91
  • [38] Chronographical spatiotemporal dynamic 4D planning
    Mazars, Thibault
    Francis, Adel
    AUTOMATION IN CONSTRUCTION, 2020, 112
  • [39] 3D AND 4D MODELING FOR DESIGN AND CONSTRUCTION COORDINATION: ISSUES AND LESSONS LEARNED
    Staub-French, Sheryl
    Khanzode, Atul
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2007, 12 : 381 - 407
  • [40] Generation of Construction Scheduling through Machine Learning and BIM: A Blueprint
    Al-Sinan, Mazen A.
    Bubshait, Abdulaziz A.
    Aljaroudi, Zainab
    BUILDINGS, 2024, 14 (04)