Investigating the Human Errors in 4D BIM Construction Scheduling

被引:0
|
作者
Kandregula, Shravan Kumar [1 ]
Le, Tuyen [1 ]
机构
[1] Clemson Univ, Glenn Dept Civil Engn Construct Engn & Management, Clemson, SC 29634 USA
来源
CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS | 2020年
关键词
Building Information Modeling; BIM; 4D-BIM; 4D-Visualization; 4D-Scheduling; Construction Scheduling; Scheduling; Construction Planning and Scheduling; Human Errors; Human Error Taxonomy (HET); Cognition error theories;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Four-dimensional building information modeling (4D-BIM or 4D scheduling) is well known to benefit the construction industry in many ways. 4D-BIM is an effective scheduling technique which integrates traditional scheduling methods and advanced visualization of the construction sequences in a 3D environment. Despite the potential benefits of 4D-BIM to improve scheduling quality, errors still often occur in construction schedules. The objective of this research is to understand the association between human errors and computer-aided scheduling. This paper focuses on examining the current practices of 4D-scheduling to gain insights on potential errors during the process of scheduling. Furthermore, the paper discusses a set of root causes of scheduling errors based on different types of human errors in cognition error theories. The research determined human errors through an integrated approach of literature review and a survey. The results of this study are expected to provide new knowledge about what human errors that commonly occur during the scheduling processing using BIM and their root causes.
引用
收藏
页码:750 / 757
页数:8
相关论文
共 50 条
  • [21] Utilizing 4D BIM Models in the Early Stages of Design
    Oezener, Ozan Oender
    Jeong, Woonseong
    Haliburton, James
    Clayton, Mark J.
    ECAADE 2010: FUTURE CITIES, 2010, : 89 - 96
  • [22] The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France
    Doukari, Omar
    Seck, Boubacar
    Greenwood, David
    FRONTIERS IN BUILT ENVIRONMENT, 2022, 8
  • [23] Visualizing high-rise building construction strategies using linear scheduling and 4D CAD
    Russell, Alan
    Staub-French, Sheryl
    Tran, Ngoc
    Wong, William
    AUTOMATION IN CONSTRUCTION, 2009, 18 (02) : 219 - 236
  • [24] Automated 4D BIM development: the resource specification and optimization approach
    Fazeli, Abdulwahed
    Banihashemi, Saeed
    Hajirasouli, Aso
    Mohandes, Saeed Reza
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024, 31 (05) : 1896 - 1922
  • [25] Identification of 4D-BIM Barriers in Offshore Construction Projects Using Fuzzy Structural Equation Modeling
    El-Habashy, Sherif
    Alqahtani, Fahad K.
    Mekawy, Mohamed
    Sherif, Mohamed
    Badawy, Mohamed
    BUILDINGS, 2023, 13 (06)
  • [26] Investigating BIM level in Iraqi construction industry
    Zaia, Yousif Youkhanna
    Adam, Sarhat Mustafa
    Abdulrahman, Farsat Heeto
    AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (03)
  • [27] The Effects of BIM Maturity Level on the 4D Simulation Performance: An Empirical Study
    Haji, M. Dadashi
    Taghaddos, H.
    Sebt, M. H.
    Chokan, F.
    Zavari, M.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2021, 34 (03): : 606 - 614
  • [28] The challenge of level of development in 4D/BIM simulation across AEC project lifecycle. A case study
    Boton, Conrad
    Kubicki, Sylvain
    Halin, Gilles
    CREATIVE CONSTRUCTION CONFERENCE 2015, SELECTED PAPERS, 2015, 123 : 59 - 67
  • [29] Investigating the Use of ChatGPT for the Scheduling of Construction Projects
    Prieto, Samuel A.
    Mengiste, Eyob T.
    de Soto, Borja Garcia
    BUILDINGS, 2023, 13 (04)
  • [30] CasCADe: A Novel 4D Visualization System for Virtual Construction Planning
    Ivson, Paulo
    Nascimento, Daniel
    Celes, Waldemar
    Barbosa, Simone D. J.
    IEEE TRANSACTIONS ON VISUALIZATION AND COMPUTER GRAPHICS, 2018, 24 (01) : 687 - 697