Investigating the Human Errors in 4D BIM Construction Scheduling

被引:0
|
作者
Kandregula, Shravan Kumar [1 ]
Le, Tuyen [1 ]
机构
[1] Clemson Univ, Glenn Dept Civil Engn Construct Engn & Management, Clemson, SC 29634 USA
来源
CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS | 2020年
关键词
Building Information Modeling; BIM; 4D-BIM; 4D-Visualization; 4D-Scheduling; Construction Scheduling; Scheduling; Construction Planning and Scheduling; Human Errors; Human Error Taxonomy (HET); Cognition error theories;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Four-dimensional building information modeling (4D-BIM or 4D scheduling) is well known to benefit the construction industry in many ways. 4D-BIM is an effective scheduling technique which integrates traditional scheduling methods and advanced visualization of the construction sequences in a 3D environment. Despite the potential benefits of 4D-BIM to improve scheduling quality, errors still often occur in construction schedules. The objective of this research is to understand the association between human errors and computer-aided scheduling. This paper focuses on examining the current practices of 4D-scheduling to gain insights on potential errors during the process of scheduling. Furthermore, the paper discusses a set of root causes of scheduling errors based on different types of human errors in cognition error theories. The research determined human errors through an integrated approach of literature review and a survey. The results of this study are expected to provide new knowledge about what human errors that commonly occur during the scheduling processing using BIM and their root causes.
引用
收藏
页码:750 / 757
页数:8
相关论文
共 50 条
  • [1] Revolutionising the 4D BIM Process to Support Scheduling Requirements in Modular Construction
    Mayouf, Mohammad
    Jones, Jamie
    Elghaish, Faris
    Emam, Hassan
    Ekanayake, E. M. A. C.
    Ashayeri, Ilnaz
    SUSTAINABILITY, 2024, 16 (02)
  • [2] 4D BIM for Construction Logistics Management
    Whitlock, Kane
    Abanda, Fonbeyin Henry
    Manjia, Marcelline Blanche
    Pettang, Chrispin
    Nkeng, George Elambo
    CIVILENG, 2021, 2 (02): : 325 - 348
  • [3] Investigating benefits and criticisms of bim for construction scheduling in SMEs: An Italian case study
    Malacarne G.
    Toller G.
    Marcher C.
    Riedl M.
    Matt D.T.
    2018, WITPress (13) : 139 - 150
  • [4] Monitoring Construction Progress Based on 4D BIM Technology
    Chen, Jingjing
    Wu, Juan
    Qu, Yan
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [5] Integrating 4D BIM and GIS for Construction Supply Chain Management
    Deng, Yichuan
    Gan, Vincent J. L.
    Das, Moumita
    Cheng, Jack C. P.
    Anumba, Chimay
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (04)
  • [6] Evaluation of 4D BIM tools applicability in construction planning efficiency
    Martins, Savio Santana
    Jorge Evangelista, Ana Catarina
    Hammad, Ahmed W. A.
    Tam, Vivian W. Y.
    Haddad, Assed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (15) : 2987 - 3000
  • [7] The Creation of Construction Schedules in 4D BIM: A Comparison of Conventional and Automated Approaches
    Doukari, Omar
    Seck, Boubacar
    Greenwood, David
    BUILDINGS, 2022, 12 (08)
  • [8] Enhancing Construction Management Education through 4D BIM and VR: Insights and Recommendations
    Abouelkhier, Narmin
    Shafiq, Muhammad Tariq
    Rauf, Abdul
    Alsheikh, Negmeldin
    BUILDINGS, 2024, 14 (10)
  • [9] Linear scheduling and 4D visualization
    Staub-French, Sheryl
    Russel, Alan
    Tran, Ngoc
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2008, 22 (03) : 192 - 205
  • [10] 4D BIM Simulation Guideline for Construction Visualization and Analysis of Renovation Projects: A Case Study
    Alzarrad, M. Ammar
    Moynihan, Gary P.
    Parajuli, Aakash
    Mehra, Mayuri
    FRONTIERS IN BUILT ENVIRONMENT, 2021, 7