Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach

被引:32
作者
Abu El-Maaty, Ahmed Ebrahim [1 ]
El-Kholy, Amr M. [2 ]
Akal, Ahmed Yousry [3 ]
机构
[1] Menoufia Univ, Dept Civil Engn, Shibin Al Kawm, Egypt
[2] Beni Suef Univ, Fac Engn, Bani Suwayf, Egypt
[3] Higher Inst Engn & Technol, Dept Civil Engn, Kafr Al Sheikh, Egypt
关键词
Regression analysis; SPSS; Mathematical modeling; Schedule overrun; Cost escalation and Highway projects; Statistical fuzzy model; ROAD CONSTRUCTION PROJECTS; DELAY; PERFORMANCE;
D O I
10.1108/ECAM-03-2016-0084
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - Modeling represents the art of translating problems from an application area into tractable mathematical formulations whose theoretical and numerical analysis provides insight, answers and guidance useful for the originating application. The purpose of this paper is to determine the causal causes of schedule overrun and cost escalation of highway projects in Egypt in order to be used as independents variables in mathematical models for predicting the percentages of schedule overrun and cost escalation of such projects in Egypt. Design/methodology/approach - A survey of a randomly selected samples yielded responses from 40 owners, 15 consultants and 56 contractors. The survey includes 38 schedule overrun factors and 26 cost escalation factors. The effectiveness degree of the identified factors has been identified by the triangle fuzzy approach. Findings - The results of the survey show that "contractor's technical staff is insufficient and ineligible to accomplish the project" is the most important cause of schedule overrun, while the major cause of cost escalation is inadequate preparation of the project concerning planning and execution. Originality/value - The main contribution of this study is predicting the percentages of schedule overrun and cost escalation of highway projects in Egypt. Through the application of the linear regression analysis method and statistical fuzzy theory, four predictive models have been developed and it has been noted that the linear regression-based model shows prediction accuracy better than statistical fuzzy-based model in predicting percentages of schedule overrun and cost escalation.
引用
收藏
页码:809 / 827
页数:19
相关论文
共 46 条
[1]  
Agrama F., 2008, CONCISE CONSTRUCTION
[2]  
Albogamy A., 2012, INT PROC EC DEV RES, V45, P148
[3]  
Alhomidan A., 2013, INT J CIVIL ENV ENG, V13, P1
[4]  
[Anonymous], 2008, THESIS
[5]  
[Anonymous], THESIS
[6]  
[Anonymous], 2010, J DESIGN BUILT ENV
[7]  
Arcila S. M, 2012, THESIS
[8]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357
[9]   Ranking of delay factors in construction projects after Egyptian revolution [J].
Aziz, Remon Fayek .
ALEXANDRIA ENGINEERING JOURNAL, 2013, 52 (03) :387-406
[10]  
Bina A., 2011, IMPORTANCE PROJECT P