A Hybrid Genetic-Heuristic Algorithm for Scheduling of Automated Guided Vehicles and Quay Cranes in Automated Container Terminals

被引:10
作者
Homayouni, S. M. [1 ]
Tang, S. H. [1 ]
Ismail, N. [1 ]
Ariffin, M. K. A. M. [1 ]
Samin, R. [1 ]
机构
[1] Univ Putra Malaysia, Upm Serdang 43300, Malaysia
来源
CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3 | 2009年
关键词
Automated guided vehicle; quay cranes; automated container terminal; genetic algorithm; AGVS;
D O I
10.1109/ICCIE.2009.5223858
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Containers have been used in past decades increasingly as one of the most important transportation tools. Containers have revolutionized cargo shipping and thus changed the world trade systematically. Container terminals as the transhipment facility play a valuable role in performance of this transportation system. Improvement of this facility has been widely considered in literatures. Automated container terminals (ACTs) have been introduced to pursue this purpose. In ACTs various transport vehicles are automated and integrated to each other. Automated guided vehicles (AGVs) are used in ACTs to handle containers between quay cranes and storage yards. Usually scheduling of the AGVs is known as the key factor to improve the performance of ACTs. This paper proposed a heuristic algorithm to schedule the AGVs concurrently with quay cranes. A genetic algorithm is proposed to optimize the simultaneous scheduling of AGVs and QCs. The results showed that proposed genetic algorithm can be used in practical implications while its running time is reasonably low.
引用
收藏
页码:96 / 101
页数:6
相关论文
共 17 条
[1]  
[Anonymous], 2004, Wiley InterScience electronic collection.
[2]  
BADAKHSHIAN M, 2008, P 38 C COMP IND ENG
[3]  
Cheng YL, 2005, APPL OPTIMIZAT, V98, P355
[4]   Scheduling material handling vehicles in a container terminal [J].
Das, SK ;
Spasovic, L .
PRODUCTION PLANNING & CONTROL, 2003, 14 (07) :623-633
[5]   Automated guided vehicle traffic control at a container terminal [J].
Evers, JJM ;
Koppers, SAJ .
TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 1996, 30 (01) :21-34
[6]   Dispatching multi-load AGVs in highly automated seaport container terminals [J].
Grunow, M ;
Günther, HO ;
Lehmann, M .
OR SPECTRUM, 2004, 26 (02) :211-235
[7]   Deadlock prevention for automated guided vehicles in automated container terminals [J].
Kim, Kap Hwan ;
Jeon, Su Min ;
Ryu, Kwang Ryel .
OR SPECTRUM, 2006, 28 (04) :659-679
[8]   A crane scheduling method for port container terminals [J].
Kim, KH ;
Park, YM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (03) :752-768
[9]   Integrated scheduling of handling equipment at automated container terminals [J].
Lau, Henry Y. K. ;
Zhao, Ying .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 112 (02) :665-682
[10]  
Liu CI, 2002, IEEE 5TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS, PROCEEDINGS, P880, DOI 10.1109/ITSC.2002.1041336