Research on 4D simulation and application for construction process of large-scale underground powerhouse

被引:0
作者
Zhong, DH [1 ]
Yang, XG [1 ]
Liu, KJ [1 ]
Hu, CS [1 ]
Li, MC [1 ]
机构
[1] Tianjin Univ, Sch Civil Engn, Tianjin 300072, Peoples R China
来源
PROCEEDINGS OF THE CHINA ASSOCIATION FOR SCIENCE AND TECHNOLOGY, VOL 1, NO 1 | 2004年
关键词
4D simulation; scheduling analysis; 3D modeling; underground powerhouse construction; visualization;
D O I
暂无
中图分类号
Q [生物科学];
学科分类号
07 ; 0710 ; 09 ;
摘要
The design and decision-making of large-scale underground powerhouse are extremely complicated processes. 4D simulation is a new dynamic technique that combines scheduling with 3D modeling. 4D simulation is applied in the construction of underground powerhouse with helping to design and analyze of construction scheme in the 4D environment. It previews the space-time logical relationship of working procedure after optimizing, and provides a shortcut way for grasping construction process fully and quickly. The technique has become a linking between designer and decision-maker, also has been a powerful aided decision making tool. Research result has been successfully applied to the construction organization of an actual project and it has wide application prospect.
引用
收藏
页码:302 / 307
页数:6
相关论文
共 6 条
  • [1] [Anonymous], 2000, PRIMITIVE SUBMITTED
  • [2] BROEKMAAT M, 2003, P 20 INT S AUT ROB C, P393
  • [3] HEESOM D, 2004, TRENDS 4D CAD APPL C, V22, P171
  • [4] KONG HY, 2001, THESIS A M U
  • [5] ZHONG DG, 2004, 1 INT C VIRT REAL IT, P365
  • [6] Zhong DH, 2001, COMPUTER SCIENCE AND TECHNOLOGY IN NEW CENTURY, P429