Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction

被引:14
作者
Park, Taekwun [2 ]
Kim, Moon Kyum [3 ]
Kim, Changyoon [1 ]
Kim, Hyoungkwan [1 ]
机构
[1] Yonsei Univ, Sch Civil & Environm Engn, Seoul 120749, South Korea
[2] Daelim Ind Corp, Seoul 110732, South Korea
[3] Yonsei Univ, Dept Civil & Environm Engn, Seoul 120749, South Korea
关键词
AUGMENTED REALITY; VISUALIZATION;
D O I
10.1061/(ASCE)CO.1943-7862.0000101
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The high expectation of esthetic and functional quality in modern civil infrastructure has resulted in the increased demand for long span bridges. In advanced or developing countries, long span bridges such as cable-stayed and suspension bridges are considered even as landmarks that symbolize the prosperity or culture of the region. These long span bridges require higher level of design and construction technologies than other types of bridges. In particular, the construction of cable-stayed bridges involves precise and sophisticated operation of construction equipment such as derrick cranes. However, it is not easy to plan the operations of a derrick crane before the actual construction process takes place. Unexpected spatial constraints in the construction site may hinder the smooth operation of a derrick crane, which leads to lower than expected productivity and safety. This study applies interactive three-dimensional (3D) computer aided design (CAD) to the derrick crane operation for the purpose of identifying potential problems. Construction managers can have the two way process with the 3D CAD system to interactively test their construction plans and scenarios. The case study shows that the interactive 3D CAD system significantly improves the constructability of the cable-stayed bridge construction.
引用
收藏
页码:1261 / 1270
页数:10
相关论文
共 10 条
[1]   Automated generation of work spaces required by construction activities [J].
Akinci, B ;
Fischer, M ;
Kunz, J .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (04) :306-315
[2]   Integrating 3D visualization and simulation for tower crane operations on construction sites [J].
Al-Hussein, Mohamed ;
Niaz, Muhammad Athar ;
Yu, Haitao ;
Kim, Hyoungkwan .
AUTOMATION IN CONSTRUCTION, 2006, 15 (05) :554-562
[3]   Georeferenced registration of construction graphics in mobile outdoor augmented reality [J].
Behzadan, Amir H. ;
Kamat, Vineet R. .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2007, 21 (04) :247-258
[4]   Mixed reality-based visualization interfaces for architecture, engineering, and construction industry [J].
Dunston, PS ;
Wang, XY .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (12) :1301-1309
[5]   Diffusion of computer aided design technology in architectural design practice [J].
Kale, S ;
Arditi, D .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (10) :1135-1141
[6]   Evaluation of augmented reality for rapid assessment of earthquake-induced building damage [J].
Kamat, Vineet R. ;
El-Tawil, Sherif .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2007, 21 (05) :303-310
[7]   Feasibility study of 4D CAD in commercial construction [J].
Koo, B ;
Fischer, M .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (04) :251-260
[8]   Constructing a complex precast tilt-up-panel structure utilizing an optimization model, 3D CAD, and animation [J].
Manrique, Juan D. ;
Al-Hussein, Mohamed ;
Telyas, Avi ;
Funston, Geoff .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (03) :199-207
[9]   Linear scheduling and 4D visualization [J].
Staub-French, Sheryl ;
Russel, Alan ;
Tran, Ngoc .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2008, 22 (03) :192-205
[10]   CASE-STUDY OF BURLINGTON CABLE-STAYED BRIDGE [J].
SWIGGUM, KE ;
ANDERSON, SD ;
RUSSELL, JS .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (03) :649-666