A scatter search approach for general flowshop scheduling problem

被引:29
|
作者
Haq, A. Noorul [1 ]
Saravanan, M.
Vivekraj, A. R.
Prasad, T.
机构
[1] Natl Inst Technol, Dept Prod Engn, Tiruchirappalli, Tamil Nadu, India
[2] RVS Coll Engn & Technol, Dindigul, Tamil Nadu, India
关键词
flow-shop; scheduling; metaheuristic; scatter search; makespan;
D O I
10.1007/s00170-005-0244-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper proposes a new evolutionary technique called scatter search for scheduling problems of a general flow-shop. Scatter search (SS) is applied to this problem as it is able to provide a wide exploration of the search space through intensification and diversification. In addition it has a unifying principle for joining solutions which exploit the adaptive memory principle to avoid generating or incorporating duplicate solutions at various stages of the problem. This methodology provides substantially better results than the Tabu search approach of Nowicki and Smutnicki (Manage Sci 42(6):797-813, 1996) and Jain and Meeran (Comput Oper Res 29:1873-1901, 2002). The proposed framework achieves an average deviation of 14.25% from the lower bound solution of benchmark problems of Demirkol et al. (Eur J Oper Res 109(1):137-141, 1998), while the scatter search technique gives the best solutions for 32 of 40 of their benchmark problems.
引用
收藏
页码:731 / 736
页数:6
相关论文
共 50 条
  • [31] Resolution of a scheduling problem in a flowshop robotic cell
    Soukhal, A
    Martineau, P
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 161 (01) : 62 - 72
  • [33] Cooperative metaheuristics for the permutation flowshop scheduling problem
    Vallada, Eva
    Ruiz, Ruben
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 193 (02) : 365 - 376
  • [34] Scatter Search for Truck Scheduling Problem with Product Loading/Unloading Constraints in a Crossdocking System
    Ye, Yan
    Fu, Hui
    Zhang, Di
    Xiao, Jun-wei
    PROCEEDINGS OF THE 22ND INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT: CORE THEORY AND APPLICATIONS OF INDUSTRIAL ENGINEERING (VOL 1), 2016, : 335 - 345
  • [35] No-wait flowshop scheduling problem to minimize the number of tardy jobs
    Aldowaisan, Tariq A.
    Allahverdi, Ali
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (1-4) : 311 - 323
  • [36] Synergy of Genetic Algorithm with Extensive Neighborhood Search for the Permutation Flowshop Scheduling Problem
    Chen, Rong-Chang
    Chen, Jeanne
    Chen, Tung-Shou
    Huang, Chien-Che
    Chen, Li-Chiu
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2017, 2017
  • [37] Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process
    Kim, YD
    Lim, HG
    Park, MW
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 91 (01) : 124 - 143
  • [38] A two-machine flowshop scheduling problem with deteriorating jobs and blocking
    Lee, Wen-Chiung
    Shiau, Yau-Ren
    Chen, Shiuan-Kang
    Wu, Chin-Chia
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2010, 124 (01) : 188 - 197
  • [39] Variable neighborhood search algorithms for the permutation flowshop scheduling problem with the preventive maintenance
    Wahiba Jomaa
    Mansour Eddaly
    Bassem Jarboui
    Operational Research, 2021, 21 : 2525 - 2542
  • [40] Variable neighborhood search algorithms for the permutation flowshop scheduling problem with the preventive maintenance
    Jomaa, Wahiba
    Eddaly, Mansour
    Jarboui, Bassem
    OPERATIONAL RESEARCH, 2021, 21 (04) : 2525 - 2542