A scatter search approach for general flowshop scheduling problem

被引:29
|
作者
Haq, A. Noorul [1 ]
Saravanan, M.
Vivekraj, A. R.
Prasad, T.
机构
[1] Natl Inst Technol, Dept Prod Engn, Tiruchirappalli, Tamil Nadu, India
[2] RVS Coll Engn & Technol, Dindigul, Tamil Nadu, India
关键词
flow-shop; scheduling; metaheuristic; scatter search; makespan;
D O I
10.1007/s00170-005-0244-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper proposes a new evolutionary technique called scatter search for scheduling problems of a general flow-shop. Scatter search (SS) is applied to this problem as it is able to provide a wide exploration of the search space through intensification and diversification. In addition it has a unifying principle for joining solutions which exploit the adaptive memory principle to avoid generating or incorporating duplicate solutions at various stages of the problem. This methodology provides substantially better results than the Tabu search approach of Nowicki and Smutnicki (Manage Sci 42(6):797-813, 1996) and Jain and Meeran (Comput Oper Res 29:1873-1901, 2002). The proposed framework achieves an average deviation of 14.25% from the lower bound solution of benchmark problems of Demirkol et al. (Eur J Oper Res 109(1):137-141, 1998), while the scatter search technique gives the best solutions for 32 of 40 of their benchmark problems.
引用
收藏
页码:731 / 736
页数:6
相关论文
共 50 条
  • [21] Scatter search based particle swarm optimization algorithm for earliness/tardiness flowshop scheduling with uncertainty
    Geng J.-C.
    Cui Z.
    Gu X.-S.
    International Journal of Automation and Computing, 2016, 13 (03) : 285 - 295
  • [22] A hybrid genetic local search algorithm for the permutation flowshop scheduling problem
    Tseng, Lin-Yu
    Lin, Ya-Tai
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 198 (01) : 84 - 92
  • [23] Scatter Search Based Particle Swarm Optimization Algorithm for Earliness/Tardiness Flowshop Scheduling with Uncertainty
    Jia-Can Geng
    Zhe Cui
    Xing-Sheng Gu
    International Journal of Automation and Computing, 2016, (03) : 285 - 295
  • [24] New VNS heuristic for total flowtime flowshop scheduling problem
    Costa, Wagner Emanoel
    Goldbarg, Marco Cesar
    Goldbarg, Elizabeth G.
    EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (09) : 8149 - 8161
  • [25] A branch-and-cut approach for the distributed no-wait flowshop scheduling problem
    Avci, Mustafa
    Avci, Mualla Gonca
    Hamzadayi, Alper
    COMPUTERS & OPERATIONS RESEARCH, 2022, 148
  • [27] Flowshop scheduling with a general exponential learning effect
    Wang, Ji-Bo
    Wang, Jian-Jun
    COMPUTERS & OPERATIONS RESEARCH, 2014, 43 : 292 - 308
  • [28] Constraint guided accelerated search for mixed blocking permutation flowshop scheduling
    Riahi, Vahid
    Newton, M. A. Hakim
    Su, Kaile
    Sattar, Abdul
    COMPUTERS & OPERATIONS RESEARCH, 2019, 102 : 102 - 120
  • [29] A multicriteria flowshop scheduling problem with setup times
    Eren, Tamer
    JOURNAL OF MATERIALS PROCESSING TECHNOLOGY, 2007, 186 (1-3) : 60 - 65
  • [30] A comparative study of algorithms for the flowshop scheduling problem
    Liu, SQ
    Ong, HL
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2002, 19 (02) : 205 - 222