A weighted assembly precedence graph for assembly sequence planning

被引:34
|
作者
Wang, Yong [1 ]
Tian, De [1 ]
机构
[1] North China Elect Power Univ, Renewable Energy Sch, Beijing 102206, Peoples R China
关键词
Assembly sequence planning; Weighted assembly precedence graph; Fuzzy analytical hierarchy process; Minimum spanning tree-based algorithm; HIERARCHICAL APPROACH; ALGORITHM; OPTIMIZATION; GENERATION; INTEGRATION; DESIGN;
D O I
10.1007/s00170-015-7565-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Assembly sequence planning is one of the well-known combinatorial optimization problems in manufacturing. An assembly is often represented as an assembly relation graph or precedence graph. The traditional methods are used to generate a large number of feasible assembly sequences and then find the optimal sequence through evaluation. A lot of computation resources are needed. To reduce the complexity of assembly sequence planning, the assembly is converted into a weighted assembly precedence graph considering multiple assembly constraints, i.e., the qualitative and quantitative constraints. The vertices in the weighted precedence graph are the parts or components. The qualitative constraints including the topological and geometrical assembly constraints guarantee to derive the feasible assembly sequences. Some process constraints are also taken as the qualitative constraints. They are represented as the directed edges in the weighted assembly precedence graph. The other assembly constraints, such as the stable support, connector strength, changes of assembly directions, and tools and so forth, are quantified as indices to compute the cost of assembly relations with the fuzzy analytical hierarchy process. The costs are taken as the heuristic information to find the optimal or near-optimal assembly sequences. With the weighted assembly precedence graph, the search space of the optimal assembly sequence will be reduced. We design a minimum spanning tree-based algorithm to detect the optimal assembly sequence based on the weighted assembly precedence graph. The optimal assembly sequences are found in O(n (3)) computation time, where n is the number of the discrete parts.
引用
收藏
页码:99 / 115
页数:17
相关论文
共 50 条
  • [41] A genetic algorithm for assembly sequence planning
    Del Valle, C
    Gasca, RM
    Toro, M
    Camacho, EF
    ARTIFICIAL NEURAL NETS PROBLEM SOLVING METHODS, PT II, 2003, 2687 : 337 - 344
  • [42] A collaborative approach to assembly sequence planning
    Dong, TY
    Tong, RF
    Zhang, L
    Dong, JX
    ADVANCED ENGINEERING INFORMATICS, 2005, 19 (02) : 155 - 168
  • [43] Constraint evaluation for assembly sequence planning
    Rohrdanz, F
    Mosemann, H
    Wahl, FM
    1997 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP'97) - TOWARDS FLEXIBLE AND AGILE ASSEMBLY AND MANUFACTURING, 1997, : 263 - 268
  • [44] Modified approach to assembly sequence planning
    Nanjing University of Science and Technology, Nanjing 210094, China
    不详
    Zhongguo Jixie Gongcheng, 2007, 14 (1676-1681):
  • [45] Assembly sequence planning for manufacturing by microrobots
    Fatikow, S
    Mounassypov, R
    1997 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP'97) - TOWARDS FLEXIBLE AND AGILE ASSEMBLY AND MANUFACTURING, 1997, : 269 - 274
  • [46] Assembly Sequence Planning for Mechanical Products
    姜华
    张玉云
    熊光楞
    周济
    Tsinghua Science and Technology, 1999, (02) : 64 - 67
  • [47] Subassembly identification for assembly sequence planning
    Wang, Yong
    Liu, Jihong
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (1-4): : 781 - 793
  • [48] Combining heuristics in assembly sequence planning
    Del Valle, C
    Toro, M
    Camacho, EF
    Gasca, RM
    Planning, Scheduling and Constraint Satisfaction: From Theory to Practice, 2005, 117 : 99 - 108
  • [49] Neural dynamic assembly sequence planning
    Kitz, Kristof
    Thomas, Ulrike
    2021 IEEE 17TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2021, : 2063 - 2068
  • [50] A scheduling approach to assembly sequence planning
    Del Valle, C
    Toro, M
    Camacho, EF
    Gasca, RM
    PROCEEDINGS OF THE 2003 IEEE INTERNATIONAL SYMPOSIUM ON ASSEMBLY AND TASK PLANNING (ISATP2003), 2003, : 103 - 108