A weighted assembly precedence graph for assembly sequence planning

被引:33
作者
Wang, Yong [1 ]
Tian, De [1 ]
机构
[1] North China Elect Power Univ, Renewable Energy Sch, Beijing 102206, Peoples R China
关键词
Assembly sequence planning; Weighted assembly precedence graph; Fuzzy analytical hierarchy process; Minimum spanning tree-based algorithm; HIERARCHICAL APPROACH; ALGORITHM; OPTIMIZATION; GENERATION; INTEGRATION; DESIGN;
D O I
10.1007/s00170-015-7565-5
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Assembly sequence planning is one of the well-known combinatorial optimization problems in manufacturing. An assembly is often represented as an assembly relation graph or precedence graph. The traditional methods are used to generate a large number of feasible assembly sequences and then find the optimal sequence through evaluation. A lot of computation resources are needed. To reduce the complexity of assembly sequence planning, the assembly is converted into a weighted assembly precedence graph considering multiple assembly constraints, i.e., the qualitative and quantitative constraints. The vertices in the weighted precedence graph are the parts or components. The qualitative constraints including the topological and geometrical assembly constraints guarantee to derive the feasible assembly sequences. Some process constraints are also taken as the qualitative constraints. They are represented as the directed edges in the weighted assembly precedence graph. The other assembly constraints, such as the stable support, connector strength, changes of assembly directions, and tools and so forth, are quantified as indices to compute the cost of assembly relations with the fuzzy analytical hierarchy process. The costs are taken as the heuristic information to find the optimal or near-optimal assembly sequences. With the weighted assembly precedence graph, the search space of the optimal assembly sequence will be reduced. We design a minimum spanning tree-based algorithm to detect the optimal assembly sequence based on the weighted assembly precedence graph. The optimal assembly sequences are found in O(n (3)) computation time, where n is the number of the discrete parts.
引用
收藏
页码:99 / 115
页数:17
相关论文
共 52 条
  • [1] [Anonymous], 2006, INTRO GRAPH THEORY
  • [2] An effective integration approach toward assembly sequence planning and evaluation
    Bai, YW
    Chen, ZN
    Bin, HZ
    Hun, J
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 27 (1-2) : 96 - 105
  • [3] AN INTEGRATED COMPUTER AID FOR GENERATING AND EVALUATING ASSEMBLY SEQUENCES FOR MECHANICAL PRODUCTS
    BALDWIN, DF
    ABELL, TE
    LUI, MCM
    DEFAZIO, TL
    WHITNEY, DE
    [J]. IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1991, 7 (01): : 78 - 94
  • [4] A behavioral scene graph for rule enforcement in interactive virtual assembly sequence planning
    Banerjee, A
    Banerjee, P
    [J]. COMPUTERS IN INDUSTRY, 2000, 42 (2-3) : 147 - 157
  • [5] Immersive Computing Technology to Investigate Tradeoffs Under Uncertainty in Disassembly Sequence Planning
    Behdad, Sara
    Berg, Leif
    Vance, Judy
    Thurston, Deborah
    [J]. JOURNAL OF MECHANICAL DESIGN, 2014, 136 (07)
  • [6] Generating assembly and machining sequences from the Face-to-Face Composition model
    Bertolotto, M
    Bruzzone, E
    DeFloriani, L
    Nagy, G
    [J]. COMPUTER-AIDED DESIGN, 1996, 28 (02) : 101 - 112
  • [7] Boothroyd G., 2002, PRODUCT DESIGN MANUF
  • [8] BOURJAULT A, 1986, RAIRO-AUTOM PROD INF, V20, P183
  • [9] An approach to multi-criteria assembly sequence planning using genetic algorithms
    Choi, Young-Keun
    Lee, Dong Myung
    Cho, Yeong Bin
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (1-2) : 180 - 188
  • [10] de Mello Homem LS, 1991, COMPUTER AIDED MECH