A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns"

被引:8
作者
Chiu, Yuan-Shyi Peter [1 ]
Ting, Chia-Kuan [1 ]
机构
[1] Chaoyang Univ Technol, Dept Ind Engn & Management, Taichung 413, Taiwan
关键词
Manufacturing; Machine breakdown; Defective item; Rework; Production;
D O I
10.1016/j.ejor.2009.03.014
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In a recently published paper by Chiu et al. [Chiu, S.W., Wang, S.-L., Chiu, Y.-S.P., 2007. Determining the optimal run time for EPQ model with scrap, rework and stochastic breakdowns. European journal of Operational Research 180, 664-676], a theorem on conditional convexity of the integrated total cost function was employed in their solution procedure. We reexamine this theorem and present a direct proof to the convexity of the total cost function. This proof can be used in place of Theorem I of Chiu et al.'s paper to enhance quality of their optimization process. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:641 / 643
页数:3
相关论文
共 3 条
  • [1] Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns
    Chiu, Singa Wang
    Wang, Shan-Ling
    Chiu, Yuan-Shyi Peter
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (02) : 664 - 676
  • [2] Hillier F. S., 2001, INTRO OPERATIONS RES, P941
  • [3] Nahmias S., 2005, PRODUCTION OPERATION, P195