Erosion-based analysis of breaching of Baige landslide dams on the Jinsha River, China, in 2018

被引:144
作者
Zhang, Limin [1 ,2 ,3 ]
Xiao, Te [1 ]
He, Jian [1 ]
Chen, Chen [1 ,2 ]
机构
[1] Hong Kong Univ Sci & Technol, Dept Civil & Environm Engn, Hong Kong, Peoples R China
[2] Sichuan Univ, Coll Water Resource & Hydropower, State Key Lab Hydraul & Mt River Engn, Chengdu, Sichuan, Peoples R China
[3] HKUST Shenzhen Res Inst, Shenzhen, Peoples R China
关键词
Landslide; Landslide dam; Dam breaching; Yangtze River; Erosion; Flood; BREAK EMERGENCY MANAGEMENT; DYNAMIC DECISION-MAKING; PART; APPLICATION; HUMAN RISKS; FAILURE; SOIL; ERODIBILITY;
D O I
10.1007/s10346-019-01247-y
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The Yangtze River is one of the most important rivers in China due to its large basin size, the large population along the river, and the numerous large dams and reservoirs on the river. The Jinsha River, the upper reach of the Yangtze River, was dammed twice recently at Baige, Tibet, one on 10 October 2018 and the other on 3 November 2018 (UTC + 8). Accordingly, two large landslide dams, 61 m and 96 m in height to the lowest dam crest, were formed in a 3-week interval. Due to the large inflow rates at the time of damming, the barrier lake level rose rapidly, posing huge risks to the downstream residents and properties. In managing the landslide dam risk, one of the important tasks is to predict the dam breaching flood beforehand. This paper focuses on rapid prediction of the dam breaching hydrograph and breach geometric parameters of the two landslide dams. The predictions were made timely before the breaching of the two landslide dams using both erosion-based empirical equations and numerical simulation and were refined based on detailed field investigation at the site after breaching. Comprehensive field investigations were conducted to determine the geological structures of the landslide dams, characterize the erodibility of dam materials, and measure the final beach dimensions. The simulated dam breaching processes, outflow hydrographs, lake water level changes, and final breach dimensions were validated by field observations. Compared with the hypothetical scenario without a diversion channel on the second landslide dam, a diversion channel 15 m in depth successfully lowered the peak flood discharge by about one third and helped to mitigate the flood risk significantly. The analysis outcome serves as basis for warning and evacuation of the downstream residents and making appropriate engineering risk mitigation plans.
引用
收藏
页码:1965 / 1979
页数:15
相关论文
共 33 条
  • [1] Annandale G.W., 2006, SCOUR TECHNOLOGY MEC
  • [2] [Anonymous], 2014, ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences II, DOI [DOI 10.5194/ISPRSANNALS-II-4-71-2014, 10.5194/isprsannals-II-4-71-2014]
  • [3] [Anonymous], 1985, US GEOL SURV OPEN FI
  • [4] Case histories in soil and rock erosion: Woodrow Wilson Bridge, Brazos River meander, Normandy Cliffs, and New Orleans levees
    Briaud, Jean-Louis
    [J]. JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2008, 134 (10) : 1425 - 1447
  • [5] 金沙江白格堰塞体结构形态与溃决特征研究
    蔡耀军
    栾约生
    杨启贵
    徐复兴
    张胜军
    石裕
    易杜靓子
    [J]. 人民长江, 2019, 50 (03) : 15 - 22
  • [6] Field testing of erodibility of two landslide dams triggered by the 12 May Wenchuan earthquake
    Chang, D. S.
    Zhang, L. M.
    Xu, Y.
    Huang, R. Q.
    [J]. LANDSLIDES, 2011, 8 (03) : 321 - 332
  • [7] Simulation of the erosion process of landslide dams due to overtopping considering variations in soil erodibility along depth
    Chang, D. S.
    Zhang, L. M.
    [J]. NATURAL HAZARDS AND EARTH SYSTEM SCIENCES, 2010, 10 (04) : 933 - 946
  • [8] Emergency Response and Back Analysis of the Failures of Earthquake Triggered Cascade Landslide Dams on the Mianyuan River, China
    Chen, Shujing
    Chen, Zuyu
    Tao, Ran
    Yu, Shu
    Xu, Wenjie
    Zhou, Xingbo
    Zhou, Zhidong
    [J]. NATURAL HAZARDS REVIEW, 2018, 19 (03)
  • [9] Back Analysis of the Draining Process of the Tangjiashan Barrier Lake
    Chen, Zuyu
    Ma, Liqiu
    Yu, Shu
    Chen, Shujing
    Zhou, Xingbo
    Sun, Ping
    Li, Xu
    [J]. JOURNAL OF HYDRAULIC ENGINEERING, 2015, 141 (04)
  • [10] China Renewable Energy Engineering Institute (CREEI), 2018, REP EM DISP BAIG LAN