The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate

被引:23
|
作者
Khouja, M [1 ]
机构
[1] Univ N Carolina, Belk Coll Business Adm, Informat & Operat Management Dept, Charlotte, NC 28223 USA
关键词
D O I
10.1023/A:1007656727418
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The economic lot and delivery scheduling problem is to simultaneously determine the production sequence of several assembly components at a supplier and the delivery interval of those components to the customer. The customer, an assembly facility, is assumed to use the components at a constant rate. The objective is to find the production sequence and delivery interval that minimize the holding, setup, and transportation cost for the supply chain. Previous solutions to the problem assume a constant production rate for each component and that all components are of acceptable quality. These assumptions ignore volume flexibility and quality cost. Volume flexibility permits a system to adjust the production rate upwards or downwards within wide limits. Also, component quality may deteriorate with larger lot sizes and decreased unit production times. In this paper. we develop an algorithm for solving the economic lot and delivery scheduling problem for a supplier using a volume flexible production system where component quality depends on both lot sizes and unit production times. We test the performance of the algorithm and illustrate the models with numerical examples.
引用
收藏
页码:715 / 725
页数:11
相关论文
共 50 条