Inter-dependent lead-time and ordering cost reduction strategy: a supply chain model with quality control, lead-time dependent backorder and price-sensitive stochastic demand

被引:11
作者
Das Roy, Monami [1 ]
Sana, Shib Sankar [2 ]
机构
[1] Vidyasagar Univ, Haldia Govt Coll, Dept Math, Purba Medinipur 721657, W Bengal, India
[2] Kishore Bharati Bhagini Nivedita Coll, Dept Math, Kolkata 700060, India
关键词
Supply chain; Lead time; Ordering cost reduction; Quality improvement; Backorder; Price-dependent stochastic demand;
D O I
10.1007/s12597-020-00499-w
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This research work addresses an inter-dependent reduction strategy of lead time and ordering cost in a two-stage single vendor and single buyer supply chain model with price-sensitive stochastic demand. Buyer's backorder rate is a variable, as it depends on the variable lead time. Quality improvement is another aspect of this study. The objective of this study is three folds. Firstly, reducing the lead time and ordering cost simultaneously. Secondly, improving the quality of products and third, optimizing order lot size, lead time, process quality parameter, safety factor, ordering cost, lead time crashing cost, backorder rate, and the number of deliveries so that the joint expected total profit becomes maximum. Stackelberg game and Joint decision, both approaches are discussed. Numerical result shows that the Joint decision approach gives better result than the Stackelberg game approach. Sensitivity analysis for Case-III with respect to some key parameters has been carried out.
引用
收藏
页码:690 / 710
页数:21
相关论文
共 40 条
  • [1] [Anonymous], INT J MANAGEMENT SCI
  • [2] Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period
    Arkan, Ali
    Hejazi, Seyed Reza
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (01) : 56 - 69
  • [3] Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction
    Chang, HC
    Ouyang, LY
    Wu, KS
    Ho, CH
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 170 (02) : 481 - 495
  • [4] Cheng-Kang Chen, 2001, International Journal on Information and Management Sciences, V12, P1
  • [5] Das Roy, 2020, INT J REC TECH ENG, V8, P1
  • [6] Das Roy, 2019, INT J RES ENG APPL M, V5, P752
  • [7] Das Roy M., 2020, INT J ANAL EXP MOD A, VXII, P470
  • [8] Das Roy M, 2017, J ADV MANAG RES, V14, P408, DOI 10.1108/JAMR-10-2016-0086
  • [9] An economic production lot size model for defective items with stochastic demand, backlogging and rework
    Das Roy, Monami
    Sana, Shib Sankar
    Chaudhuri, Kripasindhu
    [J]. IMA JOURNAL OF MANAGEMENT MATHEMATICS, 2014, 25 (02) : 159 - 183
  • [10] An integrated producer-buyer relationship in the environment of EMQ and JIT production systems
    Das Roy, Monami
    Sana, Shib Sankar
    Chaudhuri, Kripasindhu
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (19) : 5597 - 5614