Project-driven planning and scheduling support for virtual manufacturing

被引:16
作者
Banaszak, Zbigniew A.
Zaremba, Marek B.
机构
[1] Tech Univ Koszalin, Dept Comp Sci & Management, PL-75453 Koszalin, Poland
[2] Univ Quebec, Dept Informat & Ingn, Gatineau, PQ J8X 3X7, Canada
关键词
project management; virtual enterprise; scheduling; production planning; SME; project-driven manufacturing; branch and bound search;
D O I
10.1007/s10845-006-0034-0
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
The paper addresses the issue of decision-making support for small and medium-size enterprises operating within a virtual project-driven enterprise environment. The problem considered here can be defined in terms of finding a feasible schedule that satisfies the constraints imposed by the work-order duration, the price, and the time-constrained resource availability. The problem belongs to the class of multi-mode case problems of project scheduling, where finding a feasible solution is NP-hard. A heuristic method for process planning and scheduling is proposed. The method is based on a critical path approach and the branch and bound search scheme. It has been implemented in a web-enabled interactive software package, and is illustrated using the example of a virtual construction enterprise.
引用
收藏
页码:641 / 651
页数:11
相关论文
共 31 条
[1]   Web-based design and manufacturing systems for automobile components: architectures and usability studies [J].
Ahn, SH ;
Bharadwaj, B ;
Khalid, H ;
Liou, SY ;
Wright, PK .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2002, 15 (06) :555-563
[2]   Managing multi-project environments through constant work-in-process [J].
Anavi-Isakow, S. ;
Golany, B. .
International Journal of Project Management, 2003, 21 (01) :9-18
[3]  
BANASZAK Z, 2003, MANUFACTURING INTEGR, V1, P3
[4]  
BANASZAK ZA, 2005, P 16 IFAC WORLD C, P317
[5]  
BANASZAK ZA, 2004, 7 IFAC S COST OR AUT, P269
[6]   Resource-constrained project scheduling: Notation, classification, models, and methods [J].
Brucker, P ;
Drexl, A ;
Mohring, R ;
Neumann, K ;
Pesch, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) :3-41
[7]   A framework to develop an enterprise information portal for contract manufacturing [J].
Chan, MFS ;
Chung, WWC .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 75 (1-2) :113-126
[8]  
CHEN L, 2001, P ASME 2001 C DES EN
[9]   An architecture for active product configuration management in industrial virtual enterprises [J].
Choi, I ;
Bae, S .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2001, 18 (02) :133-139
[10]  
Dvir D., 2003, International Journal of Project Management, V21, P89, DOI DOI 10.1016/S0263-7863(02)00012-1