Minimizing total costs of forest roads with computer-aided design model

被引:42
作者
Akay, Abdullah E. [1 ]
机构
[1] Kahramanmaras Sutcu Imam Univ, Fac Forestry, Dept Forest Engn, TR-46100 Kahramanmaras, Turkey
来源
SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES | 2006年 / 31卷 / 5期
关键词
forest engineering; road design; optimization; road cost; sediment prediction;
D O I
10.1007/BF02715918
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Advances in personal computers (PCs) have increased interest in computer-based road-design systems to provide rapid evaluation of alternative alignments. Optimization techniques can provide road managers with a powerful tool that searches for large numbers of alternative alignments in short spans of time. A forest road optimization model, integrated with two optimization techniques, was developed to help a forest road engineer in evaluating alternative alignments in a faster and more systematic manner. The model aims at designing a path with minimum total road costs, while conforming to design specifications, environmental requirements, and driver safety. To monitor the sediment production of the alternative alignments, the average sediment delivered to a stream from a road section was estimated by using a road erosion/delivery model. The results indicated that this model has the potential to initiate a new procedure that will improve the forest road-design process by employing the advanced hardware and software capabilities of PCs and modern optimization techniques.
引用
收藏
页码:621 / 633
页数:13
相关论文
共 27 条
[21]  
MAYER RH, 1981, J CONSTRUCT DIV-ASCE, V107, P297
[22]  
Reeves CR, 1993, MODERN HEURISTIC TEC, P320
[23]  
Skaugset A, 1998, FOREST ROAD SEDIMENT
[24]  
Tan J., 2000, International Journal of Forest Engineering, V11, P33
[25]  
*USDA, 1987, FOR SERV HDB USDA
[26]  
*USDA, 1999, COST EST GUID ROAD C
[27]  
Washington Department of Natural Resources (WDNR), 1995, STAND METH COND WAT, P125