A partial-postponement decision cost model

被引:25
作者
Graman, Gregory A. [1 ]
机构
[1] Michigan Technol Univ, Sch Business & Econ, Houghton, MI 49931 USA
关键词
Inventory; Non-linear programming; Cost benefit analysis; Mass customization; Partial postponement; DELAYED PRODUCT DIFFERENTIATION;
D O I
10.1016/j.ejor.2009.03.001
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A number of factors, including product proliferation and increased customer service-level requirements, have led many companies to consider adopting postponement as a supply chain strategy. Packaging postponement is the process of delaying packaging of a common item into a final product configuration until the customer order is received. For a given product, a portion of demand is known with a high level of certainty and would not benefit from postponement. The remaining portion of demand is known with little certainty and would benefit from delaying the differentiating stage of the operation until demand is known. We develop a single-period, two-product, order-up-to cost model to aid in setting the levels of finished-goods inventory and postponement capacity. Minimum-cost optimal solutions to inventory levels and capacity are obtained by solving the derived analytical expressions using a non-linear programming formulation. We examine the sensitivity of the model to different levels of the model parameters to generate managerial insights beyond those of previous work. We show that changing product value, packaging cost, cost of postponement, holding cost, fill rate, and demand correlation can decrease expected total cost and increase postponement capacity. (C) 2009 Elsevier B. V. All rights reserved.
引用
收藏
页码:34 / 44
页数:11
相关论文
共 21 条
[1]  
Chopra S., 2003, SUPPLY CHAIN MANAGEM, V2nd
[2]  
DONG L, 2000, ALIGNING SUPPLY CHAI
[3]   Evaluation of supply chain structures through modularization and postponement [J].
Ernst, R ;
Kamrad, B .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 124 (03) :495-510
[4]   OPTIMAL INVESTMENT IN PRODUCT-FLEXIBLE MANUFACTURING CAPACITY [J].
FINE, CH ;
FREUND, RM .
MANAGEMENT SCIENCE, 1990, 36 (04) :449-466
[5]   On postponement strategies for product families with multiple points of differentiation [J].
Garg, A ;
Tang, CS .
IIE TRANSACTIONS, 1997, 29 (08) :641-650
[6]  
GARG A, 1998, 21150 RC IBM TJ WATS
[7]  
Graman GA, 2002, PROD OPER MANAG, V11, P340, DOI 10.1111/j.1937-5956.2002.tb00190.x
[8]  
GRAMAN GA, 1998, P MAN SERV OP MAN SE, P37
[9]   Dynamic programming for delayed product differentiation [J].
Hsu, HM ;
Wang, WP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 156 (01) :183-193
[10]  
KRUPP J, 1999, PRODUCTION INVENTORY, V40, P16