Risk evaluation of schedule and cost for projects based on Monte-Carlo simulation

被引:0
作者
Chen, Jun-fei [1 ]
Chen, Zhi-song [1 ]
机构
[1] Hohai Univ, State Key Lab Hydrol Water Resources & Hydraul En, Sch Business, Nanjing 210098, Peoples R China
来源
DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES A-MATHEMATICAL ANALYSIS | 2006年 / 13卷
关键词
D O I
暂无
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
A random simulating model for risk evalnation of network schedule and cost based on triangle distribution is established in this paper. The Monte-Carlo simulation on the network schedule and cost for the construction of a pumping station project is carried out, and the curves of both probability distribution and risks of network schedule and cost is obtained. On the basis of the above, the risks of network schedule and cost is evaluated, and the results show that it is effective method for project risk evaluation and helpful for guiding risk management.
引用
收藏
页码:1215 / 1218
页数:4
相关论文
共 8 条
  • [1] HU ZG, 1997, BASIC CONSTRUCTION O, V18, P23
  • [2] LI GS, 2001, J HEHAI U NATURAL SC, V29, P65
  • [3] WANG ZF, 2000, J HOHAI U, V28, P52
  • [4] WANG ZF, 1999, J HOHAI U, V27, P83
  • [5] WANG ZQ, 2002, CHINA SOFT SCI, P105
  • [6] XU Z, 1998, SYSTEM ENG THEORIES, P25
  • [7] YIN ZJ, 2002, BASIC CONSTRUCTION O, V23, P6
  • [8] YU JR, 1999, RISK ANAL PROJECT IN