Improving the availability and lengthening the life of power unit elements through the use of risk-based maintenance planning

被引:10
作者
Rusin, Andrzej [1 ]
Wojaczek, Adam [1 ]
机构
[1] Silesian Tech Univ, Konarskiego 18, PL-44100 Gliwice, Poland
关键词
Risk-based maintenance; Power unit; Boiler; Corrosion; MANAGEMENT; PLANT; OPERATION; FRAMEWORK; CORROSION; SYSTEMS;
D O I
10.1016/j.energy.2019.05.079
中图分类号
O414.1 [热力学];
学科分类号
摘要
The reliability of power systems, in terms of uninterrupted electricity supplies, is dependent on the reliability of the system's elements, especially the generation sources and transmission lines. The reliability of a coal-fired power unit's operation is essentially affected by the unit's main components, i.e. the turbine, the boiler and the generator. According to the statistics, the boiler is the most failure-prone element of the power unit. Therefore, efforts aimed at improving the reliability must include actions that enable early diagnostics of the state of the individual devices. In this paper it has been proposed that the optimal time to perform diagnostic testing of boiler tubes should be determined using risk analysis. Using the net present value (NPV) discounted cash flow index and the avoided risk criterion, a procedure has been put forward that optimizes the time when diagnostic tests should be carried out. The method has been applied to optimize diagnostic testing of boiler tubes, where corrosion is the principal cause of damage. Methods have also been given to determine the probability of the failure of such elements. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:28 / 35
页数:8
相关论文
共 36 条
[21]   Recursive Operability Analysis as a decision support tool for Risk-Based Maintenance [J].
Marmo, Luca ;
Crivelletto, Vinicio ;
Starace, Alessandro .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2009, 22 (05) :557-565
[22]   On risk-based operation and maintenance of offshore wind turbine components [J].
Nielsen, Jannie Jessen ;
Sorensen, John Dalsgaard .
RELIABILITY ENGINEERING & SYSTEM SAFETY, 2011, 96 (01) :218-229
[23]   A risk approach to the management of boiler tube thinning [J].
Noori, SA ;
Price, JWH .
NUCLEAR ENGINEERING AND DESIGN, 2006, 236 (04) :405-414
[24]   Property risk assessment for power plants: Methodology, validation and application [J].
Orme, George J. ;
Venturini, Mauro .
ENERGY, 2011, 36 (05) :3189-3203
[25]   The economics of repeated tube thickness surveys [J].
Price, J .
INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 2002, 79 (8-10) :555-559
[26]  
Pronobis M., 2002, Modernization of power boilers
[27]   Preliminary calculations of erosion wear resulting from exfoliation of iron oxides in austenitic superheaters [J].
Pronobis, Marek ;
Wojnar, Waclaw .
ENGINEERING FAILURE ANALYSIS, 2013, 32 :54-62
[28]  
Pronobis M, 2010, RYNEK ENERGII, P121
[29]  
Rusin A., 2008, FAILURE RELIABILITY
[30]  
Rusin A, 2009, 11 SCI TECHN C DES I