Improving the availability and lengthening the life of power unit elements through the use of risk-based maintenance planning

被引:10
作者
Rusin, Andrzej [1 ]
Wojaczek, Adam [1 ]
机构
[1] Silesian Tech Univ, Konarskiego 18, PL-44100 Gliwice, Poland
关键词
Risk-based maintenance; Power unit; Boiler; Corrosion; MANAGEMENT; PLANT; OPERATION; FRAMEWORK; CORROSION; SYSTEMS;
D O I
10.1016/j.energy.2019.05.079
中图分类号
O414.1 [热力学];
学科分类号
摘要
The reliability of power systems, in terms of uninterrupted electricity supplies, is dependent on the reliability of the system's elements, especially the generation sources and transmission lines. The reliability of a coal-fired power unit's operation is essentially affected by the unit's main components, i.e. the turbine, the boiler and the generator. According to the statistics, the boiler is the most failure-prone element of the power unit. Therefore, efforts aimed at improving the reliability must include actions that enable early diagnostics of the state of the individual devices. In this paper it has been proposed that the optimal time to perform diagnostic testing of boiler tubes should be determined using risk analysis. Using the net present value (NPV) discounted cash flow index and the avoided risk criterion, a procedure has been put forward that optimizes the time when diagnostic tests should be carried out. The method has been applied to optimize diagnostic testing of boiler tubes, where corrosion is the principal cause of damage. Methods have also been given to determine the probability of the failure of such elements. (C) 2019 Elsevier Ltd. All rights reserved.
引用
收藏
页码:28 / 35
页数:8
相关论文
共 36 条
[1]   Criticality-based maintenance of a coal-fired power plant [J].
Andrade Melani, Arthur Henrique ;
Murad, Carlos Alberto ;
Netto, Adherbal Caminada ;
Martha de Souza, Gilberto Francisco ;
Nabeta, Silvio Ikuyo .
ENERGY, 2018, 147 :767-781
[2]  
[Anonymous], 2010, NESSUS 8 30 SW
[3]  
Barron R.F., 2012, Design for Thermal Stresses
[4]   Development of Risk-Based Inspection and Maintenance procedures for an oil refinery [J].
Bertolini, M. ;
Bevilacqua, M. ;
Ciarapica, F. E. ;
Giacchetta, G. .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2009, 22 (02) :244-253
[5]   Risk-based decision making method for maintenance policy selection of thermal power plant equipment [J].
Carazas, F. G. ;
Souza, G. F. M. .
ENERGY, 2010, 35 (02) :964-975
[6]   Corrosive degradation and failure of vertical furnace wall tubes of a boiler [J].
Chattoraj, I ;
Das, SK ;
Ravikumar, B ;
Bhattacharya, DK .
ENGINEERING FAILURE ANALYSIS, 1997, 4 (04) :279-286
[7]   Managing the condition-based maintenance of a combined-cycle power plant: An approach using soft computing techniques [J].
Ciarapica, F. E. ;
Giacchetta, G. .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2006, 19 (04) :316-325
[8]  
Cox D.R., 1984, Analysis of Survival Data, V21
[9]  
Cruse T.A., 1997, Reliability-Based Mechanical Design
[10]   Risk management in operations of petrochemical plants: Can better planning prevent major accidents and save money at the same time? [J].
Damnjanovic, Ivan ;
Roed, Willy .
JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2016, 44 :223-231