A heuristic scheduling procedure for multi-item hoist production lines

被引:45
作者
Paul, Henrik J. [1 ]
Bierwirth, Christian
Kopfer, Herbert
机构
[1] Univ Bremen, Fac Business Studies & Econ, Bremen, Germany
[2] Univ Halle Wittenberg, Sch Econ, D-4010 Halle, Germany
关键词
TIME-WINDOW CONSTRAINTS; ELECTROPLATING LINE; ALGORITHM; FACILITY; SYSTEMS;
D O I
10.1016/j.ijpe.2005.11.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper deals with the scheduling of production lines with respect to material handling requirements. A heuristic is proposed that is capable of handling problems incorporating different product types as well as flexible processing times. In the approach time windows are maintained for all necessary operations to exploit the remaining production capacities during the planning process. The heuristic is applied to an existing problem at a centre for metal parts in the aircraft industry. To validate the approach on a broader basis, the heuristic is furthermore tested with regard to the variation of processing times, flexibilities and the product mix. Comparisons with other methods demonstrate that the new heuristic works efficiently. (c) 2006 Published by Elsevier B.V.
引用
收藏
页码:54 / 69
页数:16
相关论文
共 50 条
  • [41] Analytics Branching and Selection for the Capacitated Multi-Item Lot Sizing Problem with Nonidentical Machines
    Wu, Tao
    Liang, Zhe
    Zhang, Canrong
    INFORMS JOURNAL ON COMPUTING, 2018, 30 (02) : 236 - 258
  • [42] Multi-item distribution network design problems under volume discount on transportation cost
    Tsao, Yu-Chung
    Zhang, Qinhong
    Chen, Tsung-Hui
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (02) : 426 - 443
  • [43] Contracting with multiple suppliers: A multi-item buyer's make versus buy decision
    Chaturvedi, Aadhaar
    PRODUCTION AND OPERATIONS MANAGEMENT, 2023, 32 (02) : 434 - 448
  • [44] Multi-Item Capacitated Lot-Sizing Problems with Setup Times and Pricing Decisions
    Onal, Mehmet
    Romeijn, H. Edwin
    NAVAL RESEARCH LOGISTICS, 2010, 57 (02) : 172 - 187
  • [45] A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance
    Chiu, Yuan-Shyi Peter
    Chiu, Victoria
    Wang, Yunsen
    Hwang, Ming-Hon
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2020, 11 (04) : 509 - 524
  • [46] A MODIFIED MODELING APPROACH AND A HEURISTIC PROCEDURE FOR THE MULTI-MODE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH ACTIVITY SPLITTING
    Faghih-Mohammadi, Fatemeh
    Seifi, Abbas
    Khalighi-Sikaroudi, Mohammad
    RAIRO-OPERATIONS RESEARCH, 2016, 50 (01) : 91 - 118
  • [47] Rolling horizon production scheduling of multi-model PCBs for several assembly lines
    Koskinen, Jani
    Raduly-Baka, Csaba
    Johnsson, Mika
    Nevalainen, Olli S.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (04) : 1052 - 1073
  • [48] Collision-Free Based Model for the Cyclic Multi-Hoist Scheduling Problem
    Laajili, E.
    Lamrous, S.
    Manier, M. -A
    Nicod, J. -M
    2019 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS (SMC), 2019, : 873 - 878
  • [49] A choice-based approach to dynamic capacitated multi-item lot sizing with demand uncertainty
    Dunke, Fabian
    Nickel, Stefan
    APPLIED MATHEMATICAL MODELLING, 2025, 137
  • [50] Self-adaptive randomized constructive heuristics for the multi-item capacitated lot sizing problem
    Lai, David
    Li, Yijun
    Demir, Emrah
    Dellaert, Nico
    Van Woensel, Tom
    COMPUTERS & OPERATIONS RESEARCH, 2022, 147