A heuristic scheduling procedure for multi-item hoist production lines

被引:45
作者
Paul, Henrik J. [1 ]
Bierwirth, Christian
Kopfer, Herbert
机构
[1] Univ Bremen, Fac Business Studies & Econ, Bremen, Germany
[2] Univ Halle Wittenberg, Sch Econ, D-4010 Halle, Germany
关键词
TIME-WINDOW CONSTRAINTS; ELECTROPLATING LINE; ALGORITHM; FACILITY; SYSTEMS;
D O I
10.1016/j.ijpe.2005.11.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper deals with the scheduling of production lines with respect to material handling requirements. A heuristic is proposed that is capable of handling problems incorporating different product types as well as flexible processing times. In the approach time windows are maintained for all necessary operations to exploit the remaining production capacities during the planning process. The heuristic is applied to an existing problem at a centre for metal parts in the aircraft industry. To validate the approach on a broader basis, the heuristic is furthermore tested with regard to the variation of processing times, flexibilities and the product mix. Comparisons with other methods demonstrate that the new heuristic works efficiently. (c) 2006 Published by Elsevier B.V.
引用
收藏
页码:54 / 69
页数:16
相关论文
共 50 条
  • [31] Minimum cost delivery of multi-item orders in e-commerce logistics
    Akyuz, M. Hakan
    Muter, Ibrahim
    Erdogan, Gunes
    Laporte, Gilbert
    COMPUTERS & OPERATIONS RESEARCH, 2022, 138
  • [32] Forecast horizon of multi-item dynamic lot size model with perishable inventory
    Jing, Fuying
    Lan, Zirui
    PLOS ONE, 2017, 12 (11):
  • [33] Heuristics for the multi-item capacitated lot-sizing problem with lost sales
    Absi, Nabil
    Detienne, Boris
    Dauzere-Peres, Stephane
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (01) : 264 - 272
  • [34] A heuristic for adaptive production scheduling and control in flow shop production
    Li, Wei
    Luo, Xinggang
    Xue, Deyi
    Tu, Yiliu
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (11) : 3151 - 3170
  • [35] Optimisation model for multi-item multi-echelon supply chains with nested multi-level products
    Quetschlich, Mathias
    Moetz, Andre
    Otto, Boris
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 290 (01) : 144 - 158
  • [36] Simultaneous 2D hoist scheduling and production line design for multi-recipe and multi-stage material handling processes
    Qu, Honglin
    Wang, Sujing
    Xu, Qiang
    CHEMICAL ENGINEERING SCIENCE, 2017, 167 : 251 - 264
  • [37] Optimal Multi-Degree Cyclic Solution of Multi-Hoist Scheduling Without Overlapping
    Li, Xin
    Fung, Richard Y. K.
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2017, 14 (02) : 1064 - 1074
  • [38] Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows
    Mao, Yong-nian
    Tang, Qiu-hua
    Li, Zi-xiang
    Zhang, Li-ping
    ENGINEERING OPTIMIZATION, 2018, 50 (11) : 1978 - 1995
  • [39] Multi-item inventory control with full truckloads: A comparison of aggregate and individual order triggering
    Kiesmuller, G. P.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 200 (01) : 54 - 62
  • [40] Efficient formulation and heuristics for multi-item single source ordering problem with transportation cost
    Venkatachalam, Saravanan
    Narayanan, Arunachalam
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (14) : 4087 - 4103