A heuristic scheduling procedure for multi-item hoist production lines

被引:45
|
作者
Paul, Henrik J. [1 ]
Bierwirth, Christian
Kopfer, Herbert
机构
[1] Univ Bremen, Fac Business Studies & Econ, Bremen, Germany
[2] Univ Halle Wittenberg, Sch Econ, D-4010 Halle, Germany
关键词
TIME-WINDOW CONSTRAINTS; ELECTROPLATING LINE; ALGORITHM; FACILITY; SYSTEMS;
D O I
10.1016/j.ijpe.2005.11.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper deals with the scheduling of production lines with respect to material handling requirements. A heuristic is proposed that is capable of handling problems incorporating different product types as well as flexible processing times. In the approach time windows are maintained for all necessary operations to exploit the remaining production capacities during the planning process. The heuristic is applied to an existing problem at a centre for metal parts in the aircraft industry. To validate the approach on a broader basis, the heuristic is furthermore tested with regard to the variation of processing times, flexibilities and the product mix. Comparisons with other methods demonstrate that the new heuristic works efficiently. (c) 2006 Published by Elsevier B.V.
引用
收藏
页码:54 / 69
页数:16
相关论文
共 50 条
  • [21] An Improved Mixed Integer Programming Approach for Multi-Hoist Cyclic Scheduling Problem
    Che, Ada
    Lei, Weidong
    Feng, Jianguang
    Chu, Chengbin
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2014, 11 (01) : 302 - 309
  • [22] A Column Generation Scheme for Distributionally Robust Multi-Item Newsvendor Problems
    Wang, Shanshan
    Delage, Erick
    INFORMS JOURNAL ON COMPUTING, 2024, 36 (03) : 849 - 867
  • [23] Dynamic reordering and inspection for the multi-item Inventory Record Inaccuracy problem
    Akkerman, Fabian
    Prak, Dennis
    Mes, Martijn
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2025, 321 (02) : 428 - 444
  • [24] A multi-item approach to repairable stocking and expediting in a fluctuating demand environment
    Arts, Joachim
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 256 (01) : 102 - 115
  • [25] A branch and bound algorithm for hoist scheduling of a circuit board production line
    Ng, WC
    INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 1996, 8 (01): : 45 - 65
  • [26] Production-ratio oriented optimization for multi-recipe material handling via simultaneous hoist scheduling and production line arrangement
    Zhao, Chuanyu
    Fu, Jie
    Xu, Qiang
    COMPUTERS & CHEMICAL ENGINEERING, 2013, 50 : 28 - 38
  • [27] A multi-objective multi-item solid transportation problem with vehicle cost, volume and weight capacity under fuzzy environment
    Kar, Mouhya B.
    Kundu, Pradip
    Kar, Samarjit
    Pal, Tandra
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 35 (02) : 1991 - 1999
  • [28] Developing a multi-objective, multi-item inventory model and three algorithms for its solution
    Yousefi, Ommolbanin
    Aryanezhad, Mirbahadorgholi
    Sadjadi, Seyed Jafar
    Shahin, Arash
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE C-COMPUTERS & ELECTRONICS, 2012, 13 (08): : 601 - 612
  • [29] An effective approach to multi-item capacitated dynamic lot-sizing problems
    Li, Yanzhi
    Tao, Yi
    Wang, Fan
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (19) : 5348 - 5362
  • [30] Effective matheuristics for the multi-item capacitated lot-sizing problem with remanufacturing
    Cunha, Jesus O.
    Kramer, Hugo H.
    Melo, Rafael A.
    COMPUTERS & OPERATIONS RESEARCH, 2019, 104 : 149 - 158