A heuristic scheduling procedure for multi-item hoist production lines

被引:45
|
作者
Paul, Henrik J. [1 ]
Bierwirth, Christian
Kopfer, Herbert
机构
[1] Univ Bremen, Fac Business Studies & Econ, Bremen, Germany
[2] Univ Halle Wittenberg, Sch Econ, D-4010 Halle, Germany
关键词
TIME-WINDOW CONSTRAINTS; ELECTROPLATING LINE; ALGORITHM; FACILITY; SYSTEMS;
D O I
10.1016/j.ijpe.2005.11.008
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The paper deals with the scheduling of production lines with respect to material handling requirements. A heuristic is proposed that is capable of handling problems incorporating different product types as well as flexible processing times. In the approach time windows are maintained for all necessary operations to exploit the remaining production capacities during the planning process. The heuristic is applied to an existing problem at a centre for metal parts in the aircraft industry. To validate the approach on a broader basis, the heuristic is furthermore tested with regard to the variation of processing times, flexibilities and the product mix. Comparisons with other methods demonstrate that the new heuristic works efficiently. (c) 2006 Published by Elsevier B.V.
引用
收藏
页码:54 / 69
页数:16
相关论文
共 50 条
  • [1] Dynamic hoist scheduling for multi-recipe and multi-stage production lines: A logical framework
    Ramin, Danial
    Fraizzoli, Damiano
    Ballarino, Andrea
    Brusaferri, Alessandro
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 182
  • [2] Multi-item production routing problem with backordering: a MILP approach
    Brahimi, Nadjib
    Aouam, Tarik
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (04) : 1076 - 1093
  • [3] Hoist Scheduling for Multi-Part CHSP in Complex Lines' Configuration
    El Amraoui, A.
    Manier, M-A
    El Moudni, A.
    Benrejeb, M.
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY (ICIT), 2011,
  • [4] Multi-degree cyclic hoist scheduling with time window constraints
    Che, Ada
    Zhou, Zhen
    Chu, Chengbin
    Chen, Haoxun
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2011, 49 (19) : 5679 - 5693
  • [5] New heuristic for scheduling re-entrant production lines
    Yalaoui, Naim
    Camara, Mema
    Amodeo, Lionel
    Yalaoui, Farouk
    Mahdi, Halim
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 199 - +
  • [6] GPSO-LS algorithm for a multi-item EPQ model with production capacity restriction
    Pirayesh, Mohammadali
    Poormoaied, Saeed
    APPLIED MATHEMATICAL MODELLING, 2015, 39 (17) : 5011 - 5032
  • [7] A new method of cyclic hoist scheduling for multi-recipe and multi-stage material handling processes
    Qu, Honglin
    Wang, Sujing
    Xu, Qiang
    COMPUTERS & CHEMICAL ENGINEERING, 2016, 90 : 171 - 187
  • [8] Association rule for purchase dependence in multi-item inventory
    Bala, Pradip Kumar
    Sural, Shamik
    Banerjee, Rabindra Nath
    PRODUCTION PLANNING & CONTROL, 2010, 21 (03) : 274 - 285
  • [9] An exact solution procedure for multi-item two-echelon spare parts inventory control problem with batch ordering in the central warehouse
    Topan, Engin
    Bayindir, Z. Pelin
    Tan, Tarkan
    OPERATIONS RESEARCH LETTERS, 2010, 38 (05) : 454 - 461
  • [10] Multi-item dynamic lot sizing with multiple transportation modes and item fragmentation
    Tamssaouet, Karim
    Engebrethsen, Erna
    Dauzere-Peres, Stephane
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2023, 265