Quantitative Comparison of Project Performance between Project Delivery Systems

被引:43
|
作者
Ibrahim, Michael W. [1 ]
Hanna, Awad [2 ]
Kievet, Dave [3 ]
机构
[1] Calif State Univ Los Angeles, Construct & Engn Management, Dept Civil Engn, E&T A-215,5151 State Univ Dr, Los Angeles, CA 90032 USA
[2] Univ Wisconsin, Dept Civil & Environm Engn, Construct Engn & Management Program, 2320 Engn Hall,1415 Engn Dr, Madison, WI 53706 USA
[3] Boldt Co, 2525 Roemer Rd, Appleton, WI 54912 USA
关键词
IMPACT; STATE;
D O I
10.1061/(ASCE)ME.1943-5479.0000837
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A project delivery system (PDS) defines the relationship and timing of involvement between different contracting parties in construction. Using data from 109 projects, this paper statistically investigates the project performance of the four main PDSs: design-bid-build (DBB), construction management (CM), design-build (DB), and integrated project delivery (IPD). First, descriptive statistical methodologies were applied to the dataset to determine performance benchmarks for each examined PDS. Next, by applying statistical tests, such as the analysis of variance (ANOVA) F-test and the Kruskal-Wallis H-test, statistically significant performance differences among the examined PDSs were identified in five performance areas: cost, schedule, quality, communication, and change management. Finally, pairwise comparisons were performed by applying posthoc statistical tests to each pair of PDSs, demonstrating that IPD outperformed DBB in 11 metrics, while it outperformed CM and DB in two metrics each. Also, DB outperformed DBB in seven metrics, and CM outperformed DBB in five metrics. This paper addresses a consistently missing piece in the existing body of literature related to project delivery. The findings presented in this paper should prompt industry leaders and professionals to move away from the DBB model and toward IPD and other synergic PDSs. (c) 2020 American Society of Civil Engineers.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Comparative Analysis between Project Delivery Systems through Quantitative Assessment of Project Performance
    Ibrahim, Michael
    Hanna, Awad
    Kievet, Dave
    CONSTRUCTION RESEARCH CONGRESS 2018: CONSTRUCTION PROJECT MANAGEMENT, 2018, : 670 - 680
  • [2] Project delivery systems and project change: Quantitative analysis
    Ibbs, CW
    Kwak, YH
    Ng, T
    Odabasi, AM
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (04): : 382 - 387
  • [3] Moderating Effect of Project Type on the Relationship between Project Delivery Systems and Cost Performance
    Moon, Hyosoo
    Park, Moonseo
    Ahn, Yonghan
    Kwon, Nahyun
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2023, 39 (01)
  • [4] Comparison of US project delivery systems
    Konchar, M
    Sanvido, V
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (06): : 435 - 444
  • [5] Influence of project conflict on cost performance in different project delivery systems
    College of Management and Economics, Tianjin University, Tianjin
    300072, China
    Tongji Daxue Xuebao, 10 (1626-1632):
  • [6] Claims and Project Performance between Traditional and Alternative Project Delivery Methods
    Mehany, Mohammed S. Hashem M.
    Bashettiyavar, Gautham
    Esmaeili, Behzad
    Gad, Ghada
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2018, 10 (03)
  • [7] Municipal Water/Wastewater Project Delivery Performance Comparison
    Shane, Jennifer S.
    Bogus, Susan M.
    Molenaar, Keith R.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2013, 29 (03) : 251 - 258
  • [8] Comparison of U.S. project delivery systems
    Konchar, Mark
    Sanvido, Victor
    Journal of Construction Engineering and Management, 1998, 124 (06): : 435 - 444
  • [9] A conceptual framework to model the performance of project delivery systems
    Alarcon, Luis Fernando
    Mesa, H. Harrison
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION 2014, 2015, : 603 - 608
  • [10] The Influence of Project Life Cycle and Key Performance Indicators in Project Management Performance: Comparison between ICT and Construction Project
    Humaidi, Norshima
    Said, Noor Azzah
    CONSTRUCTION AND PROJECT MANAGEMENT, ICCPM 2011, 2011, 15 : 26 - 31