Visualization of Construction Progress Monitoring with 4D Simulation Model Overlaid on Time-Lapsed Photographs

被引:181
作者
Golparvar-Fard, Mani [1 ]
Pena-Mora, Feniosky [2 ]
Arboleda, Carlos A.
Lee, SangHyun [3 ]
机构
[1] Univ Illinois, Urbana, IL 61801 USA
[2] Columbia Univ, Fu Fdn Sch Engn & Appl Sci, New York, NY 10027 USA
[3] Univ Alberta, Dept Civil & Environm Engn, Hole Sch Construct Engn, Edmonton, AB T6G 2W2, Canada
基金
美国国家科学基金会;
关键词
PERFORMANCE;
D O I
10.1061/(ASCE)0887-3801(2009)23:6(391)
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The ability to effectively communicate progress information and represent as-built and as-planned progress discrepancies are identified as key components for successful project management that allow corrective decisions to be made in a timely manner. However, current formats of reporting (e.g., textual progress reports, progress curves, and photographs) may not properly and quickly communicate project progress. Current monitoring methods also require manual data collection and extensive data extraction from different construction documents, which distract managers from the important task of decision making. Therefore, to facilitate progress monitoring, this paper proposes visualization of performance metrics that aims to represent progress deviations through superimposition of four-dimensional (4D) as-planned model over time-lapsed photographs in single and comprehensive visual imagery. As a part of the developed system, registration of the 4D model with photographs, augmenting photographs, and occlusion removal for progress images are presented. While contextual information is preserved, the as-built photographs are enhanced and augmented with 4D as-planned model in which the performance metrics are visualized. The augmented photographs provide a consistent platform for representing as-planned, as-built, and progress discrepancies information and facilitate communication and reporting processes.
引用
收藏
页码:391 / 404
页数:14
相关论文
共 34 条
  • [1] Abba W., 1997, Program Manager Magazine, V26, P58
  • [2] PHOTO-NET II: a computer-based monitoring system applied to project management
    Abeid, J
    Allouche, E
    Arditi, D
    Hayman, M
    [J]. AUTOMATION IN CONSTRUCTION, 2003, 12 (05) : 603 - 616
  • [3] [Anonymous], 2004, J ARCHIT ENG, DOI DOI 10.1061/(ASCE)1076-0431(2004)10:3(98)
  • [4] *AUT VIZ, 2007, AUT VIZ 2007
  • [5] A survey of augmented reality
    Azuma, RT
    [J]. PRESENCE-VIRTUAL AND AUGMENTED REALITY, 1997, 6 (04): : 355 - 385
  • [6] Barrie D.S., 1992, PROFESSIONAL CONSTRU
  • [7] Material-based construction site image retrieval
    Brilakis, I
    Soibelman, L
    Shinagawa, Y
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2005, 19 (04) : 341 - 355
  • [8] Chin S., 2005, Proc., P168
  • [9] Forsyth DA, 2002, COMPUTER VISION MODE
  • [10] GOLPARVARFARD M, 2007, P CONSTR MAN EC 25 A, P1