Development of a client-based risk management methodology for the early design stage of construction processes Applied to the KSA

被引:14
作者
Albogamy, Abdullah [1 ]
Dawood, Nashwan [1 ]
机构
[1] Univ Teesside, Sch Sci & Engn, Middlesbrough, Cleveland, England
关键词
Risk assessment; Analytical hierarchy process; Monte Carlo simulation; Construction management; Risk management; Modelling; ANALYTIC HIERARCHY PROCESS; MODEL;
D O I
10.1108/ECAM-07-2014-0096
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The risk factors associated with clients have a major impact on the successful delivery of a project from early design to the construction and operation stages. Risk management studies conducted so far have not succeeded in providing an effective risk assessment methodology for clients in analysing and managing the risk factors that cause both project delays and cost overruns. So, the purpose of this paper is to provide a methodology for a client-based risk management model. Design/methodology/approach - A conceptual framework is designed by integrating the findings from a literature review and a construction industry survey in the Kingdom of Saudi Arabia. The framework includes the risk identification, risk analysis and mitigation strategy, which are the key components of the model. The model of the framework is developed by integrating the analytical hierarchy process (AHP) and Monte Carlo simulation (MCS) underpinned within an @Risk program. Findings - A case study is used to demonstrate the proposed methodology; the results found that the model helps to analyse and quantify the impact of risk factors, and also to assist in taking a suitable risk mitigation strategy, particularly at the early design stage in the construction process. Practical implications - The model is applicable to both public and private clients when they need to know the possible project duration in a new construction project, and to take some proactive actions to avoid the adverse effect of client risk factors at the early stage of the project. Originality/value - The model is expected to help in understanding the nature, and analysing the influence, of client risk factors that cause project delays and cost overruns. The development of the methodology for managing the client-based risk in construction processes at the early design stage is the key value of the study.
引用
收藏
页码:493 / 515
页数:23
相关论文
共 42 条
[1]  
Abdulaziz A., 1998, J CONSTR ENG M ASCE, V31, P124
[2]   Estimating labor production rates for industrial construction activities [J].
AbouRizk, S ;
Knowles, P ;
Hermann, UR .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (06) :502-511
[3]  
Ahmed S.M., 2002, CONSTRUCTION DELAYS
[4]   Causes of delays in Saudi Arabian public sector construction projects [J].
Al-Kharashi, Adel ;
Skitmore, Martin .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (01) :3-23
[5]  
Alaghbari W.A.M., 2005, THESIS U PUTRA MALAY
[6]   SYSTEMATIC-RISK MANAGEMENT APPROACH FOR CONSTRUCTION PROJECTS [J].
ALBAHAR, JF ;
CRANDALL, KC .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (03) :533-546
[7]   Consistency in the analytic hierarchy process: A new approach [J].
Alonso, Jose Antonio ;
Lamata, M. Teresa .
INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 2006, 14 (04) :445-459
[8]  
[Anonymous], 2012, ARAB NEWS 0404
[9]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357
[10]  
Bank Audi, 2012, SAUD AR EC REP