A polynomial algorithm for scheduling small-scale manufacturing cells served by multiple robots

被引:24
作者
Kogan, K
Levner, E
机构
[1] CTR TECHNOL EDUC HOLON, DEPT COMPUTERIZED SYST, IL-58102 HOLON, ISRAEL
[2] TEL AVIV UNIV, DEPT IND ENGN, IL-69978 TEL AVIV, ISRAEL
关键词
D O I
10.1016/S0305-0548(97)00033-6
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The n-job, two-machine, multi-robot flowshop scheduling problem is considered with the objective of minimizing makespan. Various transportation, setup and loading/unloading effects arising in a modem flexible manufacturing cell are modeled by a graph representation of the technological process. An algorithm of O(n(2)) complexity is derived to solve the problem to optimality. (C) 1997 Elsevier Science Ltd.
引用
收藏
页码:53 / 62
页数:10
相关论文
共 12 条
[1]  
BELENKII AS, 1989, AUTOMAT REM CONTR+, V50, P1
[2]   2-MACHINE FLOWSHOP SEQUENCING WITH SPARSE PRECEDENCE CONSTRAINTS [J].
GIM, BJ ;
CURRY, GL ;
DEUERMEYER, BL .
COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 26 (01) :173-180
[3]  
Johnson S.M., 1954, NAV RES LOG, V1, P61, DOI DOI 10.1002/NAV.3800010110
[4]   AUTOMATED 2-MACHINE FLOWSHOP SCHEDULING - A SOLVABLE CASE [J].
KISE, H ;
SHIOYAMA, T ;
IBARAKI, T .
IIE TRANSACTIONS, 1991, 23 (01) :10-16
[5]   2-MACHINE SCHEDULING UNDER ARBITRARY PRECEDENCE CONSTRAINTS [J].
KURISU, T .
JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1977, 20 (02) :113-131
[6]  
Lawler E. L., 1993, HDB OPERATIONS RES M, V4
[7]  
LEVIN MS, 1978, AUTOMAT REM CONTR+, V39, P1497
[8]  
LEVNER E, 1995, J OPER RES SOC, V46, P1447
[9]   SCHEDULING A 2-MACHINE ROBOTIC CELL - A SOLVABLE CASE [J].
LEVNER, E ;
KOGAN, K ;
LEVIN, I .
ANNALS OF OPERATIONS RESEARCH, 1995, 57 :217-232
[10]  
MITTEN LG, 1959, J IND ENG, V10, P131