Community responses to flood early warning system: Case study in Kaijuri Union, Bangladesh

被引:46
作者
Fakhruddin, S. H. M. [1 ]
Kawasaki, Akiyuki [2 ]
Babel, Mukand S. [1 ]
机构
[1] Asian Inst Technol, SET, WEM, Klongluang, Thailand
[2] Univ Tokyo, Dept Civil Engn, Tokyo 1138654, Japan
关键词
Medium-range flood forecasts; Agriculture risk; Early warning; Community response; RISK; VULNERABILITY; UNCERTAINTY; HAZARD;
D O I
10.1016/j.ijdrr.2015.08.004
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Early warning is a key element of disaster risk reduction. In recent decades, there have been major advancements in medium-range and seasonal forecasting. Babel et al. (2013) [1] developed an experimental medium-range (1-10 days) probabilistic flood-forecasting model for Bangladesh. This progress provides a great opportunity to improve flood warnings, and therefore, reduce vulnerability to disasters. This paper describes an integrated system on medium-range flood forecasts based on agricultural users' needs in order to reduce the farming community's flood impacts. For example, 1- to 10-day forecasts may provide farmers a range of decision options such as changing cropping patterns or planting times. The methodology included risk and vulnerability assessments conducted through community consultation. The study involved developing a flood risk map and response options to flood risk probabilistic forecasts based on farmers' needs for early warning. Understanding the use of probabilistic forecasts is still very limited, and operational forecasters are often skeptical about the ability of forecast recipients to understand the ensembles prediction system. This study showcases the ability to use probabilistic forecasts for operational decision-making purposes. The forecast lead-time requirement, impacts, and management options for crops and livestock were identified through focus group discussions, informal interviews, and surveys. The results included flood risk mapping according to the vulnerability of the communities in the study area and the early warning impacts during and after the flood events. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:323 / 331
页数:9
相关论文
共 51 条
[1]  
[Anonymous], P 5 IPW GHENT BELG
[2]  
[Anonymous], J FLOOD RISK MANAG
[3]  
Babel M.S., 2012, FLOODS RISK OPPORTUN, P357
[4]  
Berod D., 2010, ADV FLOOD FORECASTIN
[5]  
Bloschl G., 2010, ADV FLOOD FORECASTIN
[6]  
Bouriboun S., 1998, FLOOD MANAGEMENT MIT
[7]   Economic valuation of flood risk exposure and reduction in a severely flood prone developing country [J].
Brouwer, Roy ;
Akter, Sonia ;
Brander, Luke .
ENVIRONMENT AND DEVELOPMENT ECONOMICS, 2009, 14 :397-417
[8]  
Capek J., 2009, P 3 CENTR EUR C REG
[9]   Hydro-meteorological variability in the greater Ganges-Brahmaputra-Meghna basins [J].
Chowdhury, R ;
Ward, N .
INTERNATIONAL JOURNAL OF CLIMATOLOGY, 2004, 24 (12) :1495-1508
[10]   Ensemble flood forecasting: A review [J].
Cloke, H. L. ;
Pappenberger, F. .
JOURNAL OF HYDROLOGY, 2009, 375 (3-4) :613-626