A robust multi-objective optimization model for project scheduling considering risk and sustainable development criteria

被引:13
作者
Askarifard, Majid [1 ]
Abbasianjahromi, Hamidreza [2 ]
Sepehri, Mehran [3 ]
Zeighami, Ehsanollah [1 ]
机构
[1] Islamic Azad Univ, Dept Civil Engn, Arak Branch, Khomein St Arak, Iran
[2] KN Toosi Univ Technol, Dept Civil Engn, Valiasr ST, Tehran, Iran
[3] Sharif Univ Technol, Grad Sch Management, Azadi St, Tehran 1459973941, Iran
关键词
Project programming; Sustainable development criteria; Robust programming; Multi-objective mathematical model; Response surface methodology; CONSTRUCTION PROJECTS; RESOURCE-ALLOCATION; SOCIAL IMPACTS; MANAGEMENT; TIME; COST; QUALITY; PERFORMANCE; SET;
D O I
10.1007/s10668-020-01123-z
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
There is limited research that considers the sustainability aspect of the projects' schedule. The present study proposes a model to cover this gap by considering sustainable development criteria. A multi-objective model with four objective functions, including minimizing cost, risk, and socio-environmental impacts, has been presented to decrease the project's delay. Since some of the parameters are considered under conditions of uncertainty for the proximity of problems to real projects, the robust programming method is used to deal with the uncertainty, and the epsilon-constraint method was applied to solve the multi-objective model. Several scenarios are also defined to analyze the sensitivity of robust parameters in the generation of Pareto-based solutions, and the obtained results are also investigated. In addition, the design of experiments is applied for response surface methodology to determine the optimal levels of robust parameters that can generate solutions with greater variety. A real case study has been developed to implement different steps of the proposed model. Since the outcomes of the model determine the duration of each activity according to the objectives and different levels of robust parameters, managers and project owners can use this model as a tool to make appropriate decisions for their projects' schedules.
引用
收藏
页码:11494 / 11524
页数:31
相关论文
共 49 条
  • [1] A robust genetic algorithm for resource allocation in project scheduling
    Alcaraz, J
    Maroto, C
    [J]. ANNALS OF OPERATIONS RESEARCH, 2001, 102 (1-4) : 83 - 109
  • [2] Measuring the robustness of a resource allocation
    Ali, S
    Maciejewski, AA
    Siegel, HJ
    Kim, JK
    [J]. IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, 2004, 15 (07) : 630 - 641
  • [3] Assessment of social sustainability in construction projects using social network analysis
    Almahmoud, Essam
    Doloi, Hemanta
    [J]. FACILITIES, 2015, 33 (3-4) : 152 - +
  • [4] Badiru A.B., 2016, PROJECT MANAGEMENT O
  • [5] BenTal A, 2009, PRINC SER APPL MATH, P1
  • [6] Robust discrete optimization and network flows
    Bertsimas, D
    Sim, M
    [J]. MATHEMATICAL PROGRAMMING, 2003, 98 (1-3) : 49 - 71
  • [7] Robust optimization - A comprehensive survey
    Beyer, Hans-Georg
    Sendhoff, Bernhard
    [J]. COMPUTER METHODS IN APPLIED MECHANICS AND ENGINEERING, 2007, 196 (33-34) : 3190 - 3218
  • [8] Robust Resource Allocation for MIMO Wireless Powered Communication Networks Based on a Non-Linear EH Model
    Boshkovska, Elena
    Ng, Derrick Wing Kwan
    Zlatanov, Nikola
    Koelpin, Alexander
    Schober, Robert
    [J]. IEEE TRANSACTIONS ON COMMUNICATIONS, 2017, 65 (05) : 1984 - 1999
  • [9] The sustainable project management: A review and future possibilities
    Chawla, V. K.
    Chanda, A. K.
    Angra, S.
    Chawla, G. R.
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2018, 3 (03) : 157 - 170
  • [10] CPLEX S. J. I., 2003, IL