Stability of Optimal Closed-Loop Cleaning Scheduling and Control with Application to Heat Exchanger Networks under Fouling

被引:3
作者
Santamaria, Federico Lozano [1 ]
Macchietto, Sandro [1 ]
机构
[1] Imperial Coll London, Dept Chem Engn, South Kensington Campus, London SW7 2AZ, England
关键词
closed-loop scheduling; scheduling stability; optimal control and scheduling; fouling; heat exchanger networks; ENERGY EFFICIENCY; BATCH; OPTIMIZATION; NERVOUSNESS; INTEGRATION; STRATEGIES;
D O I
10.3390/pr8121623
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Heat exchanger networks subject to fouling are an important example of dynamic systems where performance deteriorates over time. To mitigate fouling and recover performance, cleanings of the exchangers are scheduled and control actions applied. Because of inaccuracy in the models, as well as uncertainty and variability in the operations, both schedule and controls often have to be revised to improve operations or just to ensure feasibility. A closed-loop nonlinear model predictive control (NMPC) approach had been previously developed to simultaneously optimize the cleaning schedule and the flow distribution for refinery preheat trains under fouling, considering their variability. However, the closed-loop scheduling stability of the scheme has not been analyzed. For practical closed-loop (online) scheduling applications, a balance is usually desired between reactivity (ensuring a rapid response to changes in conditions) and stability (avoiding too many large or frequent schedule changes). In this paper, metrics to quantify closed-loop scheduling stability (e.g., changes in task allocation or starting time) are developed and then included in the online optimization procedure. Three alternative formulations to directly include stability considerations in the closed-loop optimization are proposed and applied to two case studies, an illustrative one and an industrial one based on a refinery preheat train. Results demonstrate the applicability of the stability metrics developed and the ability of the closed-loop optimization to exploit trade-offs between stability and performance. For the heat exchanger networks under fouling considered, it is shown that the approach proposed can improve closed-loop schedule stability without significantly compromising the operating cost. The approach presented offers the blueprint for a more general application to closed-loop, model-based optimization of scheduling and control in other processes.
引用
收藏
页码:1 / 33
页数:33
相关论文
共 50 条
  • [1] Integration of optimal cleaning scheduling and control of heat exchanger networks under fouling: MPCC solution
    Santamaria, Federico Lozano
    Macchietto, Sandro
    COMPUTERS & CHEMICAL ENGINEERING, 2019, 126 : 128 - 146
  • [2] Integration of Optimal Cleaning Scheduling and Control of Heat Exchanger Networks Undergoing Fouling: Model and Formulation
    Santamaria, Federico Lozano
    Macchietto, Sandro
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2018, 57 (38) : 12842 - 12860
  • [3] Optimal energy and cleaning management in heat exchanger networks under fouling
    Georgiadis, MC
    Papageorgiou, LG
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 2000, 78 (A2) : 168 - 179
  • [4] Optimal Cleaning Cycle Scheduling under Uncertain Conditions: A Flexibility Analysis on Heat Exchanger Fouling
    Di Pretoro, Alessandro
    D'Iglio, Francesco
    Manenti, Flavio
    PROCESSES, 2021, 9 (01) : 1 - 18
  • [5] Optimization of cleaning schedules in heat exchanger networks subject to fouling
    Smaïli, F
    Vassiliadis, VS
    Wilson, DI
    CHEMICAL ENGINEERING COMMUNICATIONS, 2002, 189 (11) : 1517 - 1549
  • [6] Scheduling of heat exchanger cleaning in refinery heat exchanger networks
    Smaïli, F
    Vassiliadis, VS
    Wilson, DI
    PROCEEDINGS OF AN INTERNATIONAL CONFERENCE ON MITIGATION OF HEAT EXCHANGER FOULING AND ITS ECONOMIC AND ENVIRONMENTAL IMPLICATIONS, 2001, : 292 - 300
  • [7] Optimization of scheduling of cleaning in heat exchanger networks subject to fouling:: Sugar industry case study
    Smaïli, F
    Angadi, DK
    Hatch, CM
    Herbert, O
    Vassiliadis, VS
    Wilson, DI
    FOOD AND BIOPRODUCTS PROCESSING, 1999, 77 (C2) : 159 - 164
  • [8] Heat exchanger network cleaning scheduling: From optimal control to mixed-Integer decision making
    Al Ismaili, Riham
    Lee, Min Woo
    Wilson, D. Ian
    Vassiliadis, Vassilios S.
    COMPUTERS & CHEMICAL ENGINEERING, 2018, 111 : 1 - 15
  • [9] Optimization of Retrofit and Cleaning Schedules for Heat Exchanger Networks Subject to Fouling
    Santamaria, Federico Lozano
    Honein, Edward
    Macchietto, Sandro
    30TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, PTS A-C, 2020, 48 : 1417 - 1422
  • [10] Closed-Loop Scheduling and Control for Precision Irrigation
    Nahar, Jannatun
    Liu, Su
    Mao, Yawen
    Liu, Jinfeng
    Shah, Sirish L.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2019, 58 (26) : 11485 - 11497