Mixed-model multi-manned assembly line balancing problem: a mathematical model and a simulated annealing approach

被引:42
|
作者
Roshani, Abdolreza [1 ]
Nezami, Farnaz Ghazi [2 ]
机构
[1] Islamic Azad Univ, Kermanshah Branch, Dept Ind Engn, Kermanshah, Iran
[2] Kettering Univ, Dept Ind & Mfg Engn, Flint, MI USA
关键词
Simulated annealing; Assembly line balancing; Mixed-model production; Multi-manned workstations; SECONDARY FEEDER LINES; HEURISTIC-PROCEDURE; ALGORITHM; DESIGN; WORKSTATIONS; SYSTEMS;
D O I
10.1108/AA-02-2016-016
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Purpose - This paper aims to study a generalized type of mixed-model assembly line with multi-manned workstations where multiple workers simultaneously perform different tasks on the same product. This special kind of assembly line is usually utilized to assemble different models of large products, such as buses and trucks, on the same production line. Design/methodology/approach - To solve the mixed-model multi-manned assembly line balancing problem optimally, a new mixed-integer-programming (MIP) model is presented. The proposed MIP model is nondeterministic polynomial-time (NP)-hard, and as a result, a simulated annealing (SA) algorithm is developed to find the optimal or near-optimal solution in a small amount of computation time. Findings - The performance of the proposed algorithm is examined for several test problems in terms of solution quality and running time. The experimental results show that the proposed algorithm has a satisfactory performance from computational time efficiency and solution accuracy. Originality/value - This research is the very first study that minimizes the number of workers and workstations simultaneously, with a higher priority set for the number of workers, in a mixed-model multi-manned assembly line setting using a novel MIP model and an SA algorithm.
引用
收藏
页码:34 / 50
页数:17
相关论文
共 50 条
  • [1] Optimization Research on Mixed-Model Multi-manned Assembly Line Balancing Problem of Type I
    Yang W.
    Cheng W.
    Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2021, 56 (05): : 981 - 988
  • [2] A simulated annealing algorithm for multi-manned assembly line balancing problem
    Roshani, Abdolreza
    Roshani, Arezoo
    Roshani, Abdolhassan
    Salehi, Mohsen
    Esfandyari, Azadeh
    JOURNAL OF MANUFACTURING SYSTEMS, 2013, 32 (01) : 238 - 247
  • [3] A simulated annealing approach for multi-manned assembly line balancing problem type II
    Roshani, Abdolreza
    Giglio, Davide
    IFAC PAPERSONLINE, 2015, 48 (03): : 2299 - 2304
  • [4] A Mathematical Model and a Simulated Annealing Algorithm for Balancing Multi-manned Assembly Line Problem with Sequence-Dependent Setup Time
    Yang, Wucheng
    Cheng, Wenming
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [5] A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
    Parviz Fattahi
    Abdolreza Roshani
    Abdolhassan Roshani
    The International Journal of Advanced Manufacturing Technology, 2011, 53 : 363 - 378
  • [6] A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
    Fattahi, Parviz
    Roshani, Abdolreza
    Roshani, Abdolhassan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 53 (1-4): : 363 - 378
  • [7] Constraint programming model for multi-manned assembly line balancing problem
    Cil, Zeynel Abidin
    Kizilay, Damla
    COMPUTERS & OPERATIONS RESEARCH, 2020, 124
  • [8] Multi-manned collaborative mixed-model assembly line balancing optimization based on deep reinforcement learning
    Zhang, Mei
    Tian, Zhen-Yu
    Zhu, Jin-Hui
    Fu, Yan-Xia
    Kongzhi yu Juece/Control and Decision, 2024, 39 (10): : 3395 - 3404
  • [9] Note to: a mathematical model and ant colony algorithm for multi-manned assembly line balancing problem
    Yilmaz, Hamid
    Yilmaz, Mustafa
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2017, 89 (5-8): : 1935 - 1939
  • [10] Simulated annealing algorithms for the multi-manned assembly line balancing problem: minimising cycle time
    Roshani, Abdolreza
    Giglio, Davide
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (10) : 2731 - 2751