The effects of motivational factors on construction professionals productivity in Jordan

被引:17
作者
Al-Abbadi, Ghazi Moh'd [1 ,2 ]
Agyekum-Mensah, George [1 ,2 ]
机构
[1] Coventry Univ, Ctr Built & Nat Environm, Coventry, W Midlands, England
[2] Univ Greenwich, Dept Built Environm, London, England
关键词
Construction; motivation; productivity; project management; workers; LABOR PRODUCTIVITY; SATISFACTION;
D O I
10.1080/15623599.2019.1652951
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In the current economic conditions, improving worker productivity in construction sites is becoming increasingly vital to ensure the success of projects. Multiple factors impact the productivity of workers; however, motivation is considered to be the most important factor. Past studies indicated that low productivity is one of the main challenges facing the construction industry in Jordan. This study is an attempt to explore and rank the motivational factors affecting workers productivity in the Jordanian construction sites. To achieve this objective, a mixed research strategy was adopted involving a survey questionnaire and semi-structured interviews. The questionnaire was distributed to key players within the industry and included 16 motivational factors which were derived from past research on motivation. Using the importance index technique, the top 10 factors were identified which included: (1) personal growth/career improvement; (2) pay on time; (3) decision making ability; (4) decent and respectful job; (5) rewards; (6) pay amount; (7) high responsibility job; (8) challenging tasks; (9) work appreciation; and (10) team cooperation. Semi-structured interviews were used to validate the results from the questionnaire and to further understand the importance of worker motivation. The study concluded that if organizations paid attention to these motivational factors, then worker productivity, staff retention, organizational standards and the probability of successful project delivery should all be improved.
引用
收藏
页码:820 / 831
页数:12
相关论文
共 50 条
  • [1] Abdul KadirM.R., 2005, STRUCT SURV, V23, P42, DOI [10.1108/02630800510586907, DOI 10.1108/02630800510586907]
  • [2] Statistical Analysis on the Cost and Duration of Public Building Projects
    Abu Hammad, Ayman A.
    Ali, Souma M. Alhaj
    Sweis, Ghaleb J.
    Sweis, Rateb J.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2010, 26 (02) : 105 - 112
  • [3] ADJEI EAG, 2009, THESIS
  • [4] AHMAD SBS, 2018, INT J CONSTR MANAG, V19, P1
  • [5] Al-Momani A.H., 2000, INT J PROJ MANAG, V18, P51, DOI [10.1016/S0263-7863(98)00060-X, DOI 10.1016/S0263-7863(98)00060-X]
  • [6] Factors affecting construction labour productivity in Yemen
    Alaghbari, Wael
    Al-Sakkaf, Abubaker A.
    Sultan, Basel
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2019, 19 (01) : 79 - 91
  • [7] EMPIRICAL TEST OF A NEW THEORY OF HUMAN NEEDS
    ALDERFER, CP
    [J]. ORGANIZATIONAL BEHAVIOR AND HUMAN PERFORMANCE, 1969, 4 (02): : 142 - 175
  • [8] Issues of Construction Health and Safety in Developing Countries: A Case of Jordan
    Alkilani, Suhair Zaid
    Jupp, Julie
    Sawhney, Anil
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2013, 13 (03): : 141 - 156
  • [9] Causes of delay in large construction projects
    Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia
    [J]. Int. J. Proj. Manage., 2006, 4 (349-357): : 349 - 357
  • [10] CHAN APC, 1993, P CIB W 65 ORG MAN C, V2, P931