Cluster-based static scheduling: Theory and practice

被引:6
作者
Boeres, C [1 ]
Rebello, VEF [1 ]
机构
[1] Univ Fed Fluminense, Inst Comp, Niteroi, RJ, Brazil
来源
14TH SYMPOSIUM ON COMPUTER ARCHITECTURE AND HIGH PERFORMANCE COMPUTING, PROCEEDINGS | 2002年
关键词
D O I
10.1109/CAHPC.2002.1180769
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
Task scheduling is a key element in achieving high performance from multicomputer systems. To be efficient, scheduling algorithms must be based on a cost model appropriate for computing systems in use. The optimal scheduling of tasks is NP-hard, and a large number of heuristic algorithms have been Proposed for a variety of scheduling conditions (graph types, granularities or cost models). This paper studies the problem of task scheduling under the LogP model and presents both theoretical and experimental results for a cluster-based, task duplication methodology.
引用
收藏
页码:133 / 140
页数:8
相关论文
共 23 条
[1]   On exploiting task duplication in parallel program scheduling [J].
Ahmad, I ;
Kwok, YK .
IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, 1998, 9 (09) :872-892
[2]  
ALEXANDROV A, 1995, 7 ANN S PAR ALG ARCH
[3]  
[Anonymous], P 4 ACM SIGPLAN S PR
[4]  
Baker M., 1999, High performance cluster computing: Architectures and systems, Vol. 1, P3
[5]  
Boeres C., 1999, International Journal of Foundations of Computer Science, V10, P405, DOI 10.1142/S0129054199000290
[6]   A versatile cost modelling approach for multicomputer task scheduling [J].
Boeres, C ;
Rebello, VEF .
PARALLEL COMPUTING, 1999, 25 (01) :63-86
[7]  
Boeres C, 1999, LECT NOTES COMPUT SC, V1685, P340
[8]  
BOERES C, 2001, P 15 INT PAR DISTR P
[9]  
BOERES C, 2001, P 7 INT EUR PAR C PA, V2150, P156
[10]   CPM SCHEDULING WITH SMALL COMMUNICATION DELAYS AND TASK DUPLICATION [J].
COLIN, JY ;
CHRETIENNE, P .
OPERATIONS RESEARCH, 1991, 39 (04) :680-684