Project Scheduling Problem for Software Development with Random Fuzzy Activity Duration Times

被引:0
作者
Huang, Wei [1 ]
Ding, Lixin [1 ]
Wen, Bin [1 ]
Cao, Buqing [1 ]
机构
[1] Wuhan Univ, State Key Lab Software Engn, Wuhan 430072, Peoples R China
来源
ADVANCES IN NEURAL NETWORKS - ISNN 2009, PT 2, PROCEEDINGS | 2009年 / 5552卷
关键词
Project scheduling problem for software development; Random fuzzy simulation; Genetic algorithm; Hybrid intelligent algorithm; EXPECTED VALUE; COSTS; MODEL;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper presents a new method that describes activity duration times, which can be as random fuzzy variables to solve the software project scheduling problem. It solves the problem of the present classic models, such as PERT and CPM, which are weak in solving project scheduling problem for software development due to the Concurrent, iterative and evolutionary nature characteristics of software projects. Next, a novel stochastic software project scheduling model -expected cost model -is suggested. Furthermore, basing on genetic algorithm and random fuzzy simulation, a hybrid intelligent algorithm is designed to solve the expected cost model. Numerical experiments illustrate the effectiveness of the hybrid intelligent algorithm.
引用
收藏
页码:60 / 69
页数:10
相关论文
共 17 条
  • [1] BLUM BI, 1992, SOFTWARE ENG HOLLSTI
  • [2] Burgess A.R., 1962, J IND ENGINEERING, V13, P76
  • [3] Time-line based model for software project scheduling with genetic algorithms
    Chang, Carl K.
    Jiang, Hsin-yi
    Di, Yu
    Zhu, Dan
    Ge, Yujia
    [J]. INFORMATION AND SOFTWARE TECHNOLOGY, 2008, 50 (11) : 1142 - 1154
  • [4] A net practice for software project management
    Chang, CK
    Christensen, M
    [J]. IEEE SOFTWARE, 1999, 16 (06) : 80 - 88
  • [5] Minimizing resource availability costs in time-limited project networks
    Demeulemeester, E
    [J]. MANAGEMENT SCIENCE, 1995, 41 (10) : 1590 - 1598
  • [6] Kelley J.E., 1963, IND SCHEDULING, P347
  • [7] CRITICAL-PATH PLANNING AND SCHEDULING - MATHEMATICAL BASIS
    KELLEY, JE
    [J]. OPERATIONS RESEARCH, 1961, 9 (03) : 296 - 320
  • [8] Liu B., 2002, Theory and practice of uncertain programming
  • [9] Expected value of fuzzy variable and fuzzy expected value models
    Liu, BD
    Liu, YK
    [J]. IEEE TRANSACTIONS ON FUZZY SYSTEMS, 2002, 10 (04) : 445 - 450
  • [10] LIU LC, 1989, IEEE T SOFTWARE ENG, V15, P1280, DOI 10.1109/TSE.1989.559781