Resource-Constrained Scheduling for Maritime Traffic Management

被引:0
|
作者
Agussurja, Lucas [1 ]
Kumar, Akshat [1 ]
Lau, Hoong Chuin [1 ]
机构
[1] Singapore Management Univ, Sch Informat Syst, Singapore, Singapore
来源
THIRTY-SECOND AAAI CONFERENCE ON ARTIFICIAL INTELLIGENCE / THIRTIETH INNOVATIVE APPLICATIONS OF ARTIFICIAL INTELLIGENCE CONFERENCE / EIGHTH AAAI SYMPOSIUM ON EDUCATIONAL ADVANCES IN ARTIFICIAL INTELLIGENCE | 2018年
基金
新加坡国家研究基金会;
关键词
BENDERS DECOMPOSITION;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
We address the problem of mitigating congestion and preventing hotspots in busy water areas such as Singapore Straits and port waters. Increasing maritime traffic coupled with narrow waterways makes vessel schedule coordination for just-in-time arrival critical for navigational safety. Our contributions are: 1) We formulate the maritime traffic management problem based on the real case study of Singapore waters; 2) We model the problem as a variant of the resource-constrained project scheduling problem (RCPSP), and formulate mixed-integer and constraint programming (MIP/CP) formulations; 3) To improve the scalability, we develop a combinatorial Benders (CB) approach that is significantly more effective than standard MIP and CP formulations. We also develop symmetry breaking constraints and optimality cuts that further enhance the CB approach's effectiveness; 4) We develop a realistic maritime traffic simulator using electronic navigation charts of Singapore Straits. Our scheduling approach on synthetic problems and a real 55-day AIS dataset results in significant reduction of the traffic density while incurring minimal delays.
引用
收藏
页码:6086 / 6093
页数:8
相关论文
共 50 条
  • [1] Disruption management for resource-constrained project scheduling
    Zhu, G
    Bard, JF
    Yu, G
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2005, 56 (04) : 365 - 381
  • [2] Scheduling of resource-constrained projects
    Zilinskas, A
    INTERFACES, 2001, 31 (04) : 133 - 135
  • [3] RESOURCE-CONSTRAINED ASSIGNMENT SCHEDULING
    MAZZOLA, JB
    NEEBE, AW
    OPERATIONS RESEARCH, 1986, 34 (04) : 560 - 572
  • [4] Scheduling of resource-constrained projects
    Wilson, J
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) : 846 - 846
  • [5] HEURISTICS FOR RESOURCE-CONSTRAINED SCHEDULING
    ELSAYED, EA
    NASR, NZ
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1986, 24 (02) : 299 - 310
  • [6] Extending the Resource-Constrained Project Scheduling Problem for Disruption Management
    Kuster, Juergen
    Jannach, Dietmar
    INTELLIGENT TECHNIQUES AND TOOLS FOR NOVEL SYSTEM ARCHITECTURES, 2008, 109 : 43 - 61
  • [7] Extending the resource-constrained project scheduling problem for disruption management
    Kuster, Juergen
    Jannach, Dietmar
    2006 3RD INTERNATIONAL IEEE CONFERENCE INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2006, : 91 - 98
  • [8] The Complexity Landscape of Resource-Constrained Scheduling
    Ganian, Robert
    Hamm, Thekla
    Mescoff, Guillaume
    PROCEEDINGS OF THE TWENTY-NINTH INTERNATIONAL JOINT CONFERENCE ON ARTIFICIAL INTELLIGENCE, 2020, : 1741 - 1747
  • [9] Performance of Resource-Constrained Scheduling Heuristics
    Franco-Duran, Diana M.
    de la Garza, Jesus M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2020, 146 (04)
  • [10] Disorder considerations in resource-constrained scheduling
    Christodoulou, Symeon E.
    Ellinas, Georgios N.
    Aslani, Pooyan
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (03) : 229 - 240