Analytical Solution for Lined Circular Tunnels in Deep Viscoelastic Burgers Rock Considering the Longitudinal Discontinuous Excavation and Sequential Installation of Liners

被引:81
作者
Chu, Zhaofei [1 ]
Wu, Zhijun [1 ]
Liu, Quansheng [2 ]
Liu, Baoguo [3 ]
Sun, Jinglai [4 ]
机构
[1] Wuhan Univ, Sch Civil Engn, Wuhan 430072, Peoples R China
[2] Wuhan Univ, Key Lab Safety Geotech & Struct Engn Hubei Prov, Sch Civil Engn, Wuhan 430072, Peoples R China
[3] Beijing Jiaotong Univ, Sch Civil Engn, Beijing 100044, Peoples R China
[4] Beijing Municipal Engn Res Inst, Geotech Engn Ctr, Beijing 100037, Peoples R China
基金
中国国家自然科学基金;
关键词
Analytical solution; Circular lined tunnel; Burgers model; Longitudinal excavation; Time dependence; Viscoelastic rock; TIME-DEPENDENT BEHAVIOR; BACK ANALYSIS; RHEOLOGICAL MODEL; CREEP TESTS; DEFORMATION; FACE; DISPLACEMENTS; PREDICTION; STABILITY; CLOSURE;
D O I
10.1061/(ASCE)EM.1943-7889.0001912
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Tunneling stoppage often occurs during tunnel construction, especially in weak and rheological ground. The discontinuous excavation caused by the stoppage usually has a certain impact on the tunnel convergence and supporting pressure. This study develops a closed-form analytical solution for a deep-buried circular tunnel excavated in viscoelastic rock, in which the progress of longitudinal discontinuous excavation (the stoppage that occurs during tunneling) and the sequential installation of double elastic liners are considered. In the derivation, the change in the advance rate of the tunnel face before and after stopping is also considered. Corresponding to the whole construction process, the solution is solved step by step in five stages, and a generalized derivation procedure for any viscoelastic model is provided depending on the integral equation theory. Particularly for the Burgers model, explicit expressions for the time-dependent rock displacement and stress as well as the pressure on the two liners are presented, which can be reduced to the previous viscoelastic solutions with a constant advance rate or without the face effect. For validation purpose, comparisons are made between the proposed solution and previous existing solutions as well as the numerical results obtained by the finite-difference simulations. Additionally, to further verify the applicability of the presented solution in tunnel applications, the time-dependent tunnel convergence and liner stress of the four typical cross sections in the Saint Martin La Porte access adit are predicted, which are in good agreement with the corresponding field monitoring data. Compared with previous solutions, the proposed solution is more comprehensive and suitable for more complex tunnels with various excavation methods, rheological rocks, and supporting forms.
引用
收藏
页数:21
相关论文
共 88 条
[1]   Assessment of the factors affecting the advance rate of the Tunnel Gerede, the longest and one of the most problematic water transmission tunnels of Turkey [J].
Alp, Murat ;
Apaydin, Ahmet .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 89 :157-169
[2]   Back analysis of closure parameters of Panet equation and Burger's model of Babolak water tunnel conveyance [J].
Asadollahpour, Ebrahim ;
Rahmannejad, Reza ;
Asghari, Alireza ;
Abdollahipour, Abolfazl .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2014, 68 :159-166
[3]   Analysis of the behaviour of a yield-control support system in squeezing rock [J].
Barla, G. ;
Bonini, M. ;
Semeraro, M. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2011, 26 (01) :146-154
[4]  
Barla G, 2010, ISSMGE International Journal of Geoengineering Case Histories, V2, P40
[5]   Full-face excavation of large tunnels in difficult conditions [J].
Barla, Giovanni .
JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2016, 8 (03) :294-303
[6]   Time-Dependent Modeling of Tunnels in Squeezing Conditions [J].
Barla, Giovanni ;
Debernardi, Daniele ;
Sterpi, Donatella .
INTERNATIONAL JOURNAL OF GEOMECHANICS, 2012, 12 (06) :697-710
[7]   A case study on TBM tunnelling in fault zones and lessons learned from ground improvement [J].
Bayati, Massoud ;
Hamidi, Jafar Khademi .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 63 :162-170
[8]   Lined Circular Tunnels in Elastic Transversely Anisotropic Rock at Depth [J].
Bobet, Antonio .
ROCK MECHANICS AND ROCK ENGINEERING, 2011, 44 (02) :149-167
[9]   Back analysis of time-dependent behaviour of a test gallery in claystone [J].
Boidy, E ;
Bouvard, A ;
Pellet, E .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2002, 17 (04) :415-424
[10]   The Saint Martin La Porte access adit (Lyon-Turin Base Tunnel) revisited [J].
Bonini, M. ;
Barla, G. .