Identifying the most important public-private partnership risks in Afghanistan's infrastructure projects

被引:8
作者
Bayat, Farhad [1 ]
Noorzai, Esmatullah [2 ]
Golabchi, Mahmood [2 ]
机构
[1] Minist Urban Dev, Kabul, Afghanistan
[2] Univ Tehran, Sch Architecture, Dept Project & Construct Management, Tehran, Iran
关键词
Public-private partnership; Risk factor; Factor analysis; Infrastructure projects; Construction in developing countries; CRITICAL SUCCESS FACTORS; KEY PERFORMANCE INDICATORS; CONFLICT; PPP; ALLOCATION; FDI; FRAMEWORK; SECURITY; CHINESE; COSTS;
D O I
10.1108/JFMPC-08-2018-0045
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Purpose The purpose of this paper is to identify the major public-private partnership (PPP) risks in infrastructure projects in Afghanistan and explain the extent to which extent the identified risks can shed light on the PPP implementation study in general. Design/methodology/approach Initially, 78 risks were identified through considering international laws and regulations, criteria for using PPP in developing and underdeveloped countries, and case studies. Later, 23 of the more important risks were determined, ranked and classified into five main groups. Findings Finally, these risks were adapted with some investigations conducted in the PPP field. Although some of the risks identified in this survey are unique to Afghanistan, this research can be used to develop the application of PPP generally. Originality/value PPP is one possible solution to finance infrastructure projects. However, there are a lot of risks, which make this method inefficient in Afghanistan. Therefore, identifying the risks of PPP can play an important role in improving the infrastructures of Afghanistan.
引用
收藏
页码:309 / 337
页数:29
相关论文
共 114 条
[1]   The economic costs of conflict: A case study of the Basque Country [J].
Abadie, A ;
Gardeazabal, J .
AMERICAN ECONOMIC REVIEW, 2003, 93 (01) :113-132
[2]  
Abdullah S.H., 1980, GEOLOGICAL SURVEY AF, V2
[3]  
Abednego M. P., 2006, International Journal of Project Management, V24, P622, DOI 10.1016/j.ijproman.2006.07.010
[4]  
ADB, 2008, PUBL PRIV PARTN HDB
[5]   The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran [J].
Ahmadabadi, Ali Akbari ;
Heravi, Gholamreza .
TRANSPORT POLICY, 2019, 73 :152-161
[6]   A Fuzzy Approach for the Allocation of Risks in Public-Private Partnership Water-Infrastructure Projects in Developing Countries [J].
Ameyaw, Ernest Effah ;
Chan, Albert P. C. .
JOURNAL OF INFRASTRUCTURE SYSTEMS, 2016, 22 (03)
[7]   Risk ranking and analysis in PPP water supply infrastructure projects An international survey of industry experts [J].
Ameyaw, Ernest Effah ;
Chan, Albert P. C. .
FACILITIES, 2015, 33 (7-8) :428-+
[8]  
[Anonymous], AFGH BUS ATT EC GOV
[9]  
[Anonymous], PROJ FIN SUST SOL AD
[10]  
[Anonymous], OECD ITF JOINT TRANS