Two-machine flowshop scheduling problem to minimize maximum lateness with bounded setup and processing times

被引:0
作者
Allahverdi, Ali [1 ]
机构
[1] Kuwait Univ, Coll Engn & Petr, Dept Ind Engn & Management Syst, Safat, Kuwait
来源
KUWAIT JOURNAL OF SCIENCE & ENGINEERING | 2006年 / 33卷 / 02期
关键词
bounded times; dominance relations; flowshop; maximum lateness; scheduling;
D O I
暂无
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
This study addresses a two-machine flowshop scheduling problem to minimize maximum lateness where setup times are treated as separate and sequence-independent. Both processing and setup times on both machines are relaxed to be unknown variables. The only known information is that lower and upper bounds are known for both processing and setup times of each job. For such a scheduling environment, there may not exist a unique schedule that remains optimal for any realization of setup and processing times. Moreover, for such a scheduling environment, the exact setup and processing times will not be known until all jobs are processed. Therefore, the objective for such a scheduling problem is to reduce the size of the solution set, which contains at least one optimal solution for any combination of feasible realizations of processing and setup times. In this paper, a local and global dominance relation are established in order to reduce the size of the solution set. Illustrative numerical examples are also given.
引用
收藏
页码:233 / 252
页数:20
相关论文
共 14 条
[1]   Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness [J].
Allahverdi, A .
COMPUTERS & OPERATIONS RESEARCH, 1996, 23 (10) :909-916
[2]   Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications [J].
Allahverdi, A ;
Al-Anzi, FS .
COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (08) :971-994
[3]  
Allahverdi A., 2003, International Transactions in Operational Research, V10, P65, DOI 10.1111/1475-3995.00393
[4]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[5]   Job lateness in flowshops with setup and removal times separated [J].
Allahverdi, A ;
Aldowaisan, T .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (09) :1001-1006
[6]  
Allahverdi A., 2003, INT J MATH MATH SCI, V39, P2475
[7]   JOB LATENESS IN A 2-MACHINE FLOWSHOP WITH SETUP TIMES SEPARATED [J].
DILEEPAN, P ;
SEN, T .
COMPUTERS & OPERATIONS RESEARCH, 1991, 18 (06) :549-556
[8]  
Grabowski J., 1980, Opsearch, V17, P133
[9]   Scheduling jobs with uncertain setup times and sequence dependency [J].
Kim, SC ;
Bobrowski, PM .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1997, 25 (04) :437-447
[10]   Optimal makespan scheduling with given bounds of processing times [J].
Lai, TC ;
Sotskov, YN ;
Sotskova, NY ;
Werner, F .
MATHEMATICAL AND COMPUTER MODELLING, 1997, 26 (03) :67-86